Sitemap
Main sections
Services
Projects
-
"CRAZY BBQ" Restaurant (Prolisky Village, Kyiv Region)
-
"PARK TOWN" Shopping center (Borispil City, Kyiv Region)
-
1.5 MW cogeneration unit at a biogas station in Donetsk region
-
10.5 MW solar power plant (Ivano-Frankivsk region)
-
15 MW solar power plant (Kyiv region)
-
150 MW wind power plant (Donetsk region)
-
16.87 MW SPP in Chortkiv district Ternopil region
-
20 MW SPP in Ustynivka district Kirovohrad region
-
22.4 MW wind power plant (Odessa region)
-
25 MW wind power plant (Mykolaiv region)
-
25.2 and 50.4 MW wind and solar power plant (Ivano-Frankivsk region)
-
250 MW wind power plant (Kherson region)
-
300 MW wind power plant (Kiev region)
-
300 MW wind power plant (Mykolaiv region)
-
40.5 MW wind power plant (Kiev region)
-
5.1 MW solar power plant (Kherson region)
-
50 MW / 100 MW × energy storage system
-
57.6 MW wind power plant (Odessa region)
-
63 MW wind power plant (Zaporizhzhia region)
-
7.5 MW Solar Power Plant (Kiev Region)
-
72 MW wind power plant (Rivne region)
-
75 MW steel shop
-
76.5 MW wind power plant (Odessa region)
-
8 MW SPP in Rivne region
-
8,1 MW SPP of the Cherkasy region
-
9,8 MW SPP in Zalukva village Galitsky district Ivano-Frankivsk region
-
9.3 MW Solar Power Plant (Kirovograd Region)
-
9.9 MW solar power plant (Kyiv region)
-
9.9 MW solar power plant (Kyiv region)
-
9.9 MW solar power plant (Kyiv region)
-
9.9 MW solar power plant (Kyiv region)
-
9.9 МW SPP in Primorsk city Primorsk district Zaporizka region
-
9.995 MW Solar Power Plant (Dnipropetrovsk Region)
-
Agroindustrial complex for storage and processing of agricultural production (Dymerka village, Brovary District, Kyiv Region)
-
BESS installation 44 MW city of Kalush in the Ivano-Frankivsk region
-
BESS installation 44 MW in the Kyiv region
-
BESS installation 44 MW village Pohovka, Ivano-Frankivsk district in the Ivano-Frankivsk region
-
Biogas power plant 1,3 МW (Cherkasy city)
-
Biomass Power Plant 5 MW (Pereyaslav-Khmelnytsky, Kyiv Oblast)
-
Biomass Power Plant with capacity of 2 MW (Novosilki Village, Kyiv Region)
-
Biomass power plant (Sokyryany district, Chernivtsi region)
-
Biomass power plant 9 МW (Кyiv region)
-
Biomass power plant with 12 MW capacity (Kyiv region)
-
CHP on peanut sunflower with capacity 7 МW (Odessa region)
-
Cogeneration plant 2,5 MW on milling peat (Yagotin, Kyiv region)
-
Cogeneration plant for combined production of electric and thermal energy from mine gas with a capacity of 3.2 MW (Sukhodolsk, Lugansk region).
-
Cogeneration unit 12.1 MW
-
Cogeneration unit 13.16 MW (Kirovograd region)
-
Connection of facilities of butter factory with capacity 2400 kW to the electric networks (Kyiv region)
-
Construction of a new 220 kV substation with 160 MVA transformers
-
Electricity market analysis
-
Energy storage unit 20 MW/40 MWh
-
Engineering complex with installed system of biogas collection from SDW landfill for electricity production with capacity of 1063 kW (Borispil district, Kyiv region)
-
Engineering complex with installed system of biogas collection from SDW landfill for production of electricity (Stadnitsya Village, Vinnitsky Region)
-
Engineering complex with installed system of biogas in Ukraine collection from SDW landfill for production of electricity (Obukhiv district, Kyiv region)
-
External power supply of the industrial park (Kyiv region)
-
Five solar power plants 925 kW each (Zhytomyr region)
-
Forecasting electricity generation
-
Four solar power plants with a total capacity of 55.5 MW (Zhytomyr and Dnipropetrovsk regions)
-
Gas compressor station (Boyarka, Kiev region)
-
Ground-based photovoltaic solar power plant 950 kW (Kyiv region)
-
Ground-based solar power plant with a capacity of 9.8 MW (Kirovograd region)
-
Highly maneuverable generation up to 15 MW in Kyiv region
-
IT-park with capacity 7,5 MW (Lviv city)
-
Industrial park (Big Dymerka settlement, Kiev region)
-
Integrated engineering structure with the system for collecting biogas from the landfill for production of electricity with a capacity of 680 kW (Kremenchug, Poltava region).
-
Logistic Park with capacity of 8 MW (Kievo-Svyatoshinskiy District, Kyiv Region)
-
Maintenance unit (Kharkiv city)
-
Manufacturing enterprise (Boryspil, Kyiv region)
-
Motorcycle plant Kyiv region
-
Obtaining of a license for electricity supply (Lviv city)
-
On - site solar power plant 10 МW (Shpoliansky District, Cherkassy Region)
-
On - site solar power plant with capacity of 1 MW (Gurzuf, Republic of Crimea)
-
On - site solar power plant with capacity of 25 MW (Kamianka city, Cherkasy region)
-
On - site solar power plant, 2.5 MW (Kherson Region)
-
On - site solar power plant, 25 МW (Ivankiv District, Kyiv Region)
-
On - site solar power plant, 27 МW (Skadovsky District, Kherson Region)
-
On - site solar power plant, 3 МW (Makariv District, Kyiv Region)
-
On - site solar power plant, 42 МW (Boguslavsky District, Kyiv Region)
-
On - site solar power plant, 6 MW (Kherson Region)
-
On - site solar power plant, 60 MW (Skvira district, Kyiv region)
-
On - site solar power plant, 7 МW (Khrystynivka District, Cherkasy Region)
-
On - site solar power plant, 9 МW (Skadovsky District, Kherson Region)
-
On - site solar power plant, 9.9 МW (Malynsky District, Zhytomyr Region)
-
On-site PV power plant 1,8 МW (Kyiv region)
-
On-site solar power plant with capacity of 1 MW (Kyiv region)
-
On-site solar power plant with capacity of 9 MW (Odesa region)
-
Power plant on biomass with a capacity of 12.5 MW (Borodyanka, Kyiv region)
-
Privat Solar Power Plant (SPP) with capacity of 9,8 kW (Boryspilsky District, Kyiv Region)
-
Provider of commercial accounting services (ASKOE) of energy facilities
-
Residential building capacity of 811 kW (Boryspil, Kyiv region)
-
Residential complex 2260 kW of Kyiv region
-
Residential complex 4900 kW of Kyiv-Svyatoshinsky district of the Kyiv region
-
Restaurant complex in Goloseevskiy park (Kyiv city)
-
Roof and on-site solar power plants (urban village Chabany, Kyiv region)
-
Roof solar power plant with a capacity of 0.8 MW (Vinogradov, Zakarpatska region).
-
Roof solar power plant with a capacity of 1 MW (Brovarsky district, Kiev region).
-
Roof solar power plant with capacity of 150 kW (Brovarskyi district, Kyiv region)
-
SPP 9,8 MW in Shpolyansky district Cherkasy region
-
Scheme for the long-term development of the distribution system until 2032
-
Scheme of perspective development of the distribution system until 2029
-
Scheme of perspective development of the distribution system until 2029
-
Scheme of perspective development of the distribution system until 2030
-
Scheme of perspective development of the distribution system until 2031
-
Serving cooperative society (Vishgorodsky District, Kyiv Region)
-
Serving cooperative society in Kyiv region
-
Shopping and entertainment center (Kyiv-Svyatoshinsky district, Kyiv Region)
-
Shopping center (Kyiv City)
-
Six solar power plants with a total capacity of 60.5 MW
-
Solar Power Plant 30 kW (Cherkasy region)
-
Solar power plant 0.78 MW (Kharkiv region)
-
Solar power plant 15 МW (Zhytomyr region)
-
Solar power plant 170 MW (Dnipropetrovsk region)
-
Solar power plant 19 900 kW (Zaporizhzhya region)
-
Solar power plant 2 MW (Kiev region)
-
Solar power plant 2.475 kW (Zhytomyr region)
-
Solar power plant 2500 kW (Ternopil region)
-
Solar power plant 30 MW (Cherkasy region)
-
Solar power plant 32 MW (Kiev region)
-
Solar power plant 4 MW (Kiev region)
-
Solar power plant 4.95 MW (Dnipropetrovsk region)
-
Solar power plant 40 MW (Cherkasy region)
-
Solar power plant 9 MW (Khmelnytsky region)
-
Solar power plant 975 kW (Poltava region)
-
Solar power plant at the roofs of buildings of hypermarket with capacity 1,6 МW (Kyiv city)
-
Solar power plant up to 350 MW (Dnipropetrovsk region)
-
Solar power plants with capacity 91 МW (Dnipropetrovska region)
-
Solar power plants with total installed capacity 52,5 МW (Odessa region)
-
Sports and entertainment complex with a capacity of 10 MW (Kiev)
-
System of biogas collection and utilization at the SDW landfill (Mariupol, Donetsk region)
-
The biogas collection and utilization system for electricity production at the Chernigov Solid Household Waste Landfill
-
The scheme of perspective development of distribution system till 2029
-
Thermal power plant with a capacity of 6 MW (Kyiv region)
-
Three wind power plants with a capacity of up to 120 MW (Zhytomyr region)
-
Three wind power plants with a total capacity of up to 180 MW (Zhytomyr region)
-
Traction substation 150/35/10 kV "Yakymivka" (Zaporizhzhya region)
-
Turbogenerator with condenser turbine 23,751 MW (Kirovograd region)
-
Two solar power plants 4900 kW each (Zaporizhia region)
-
Two solar power plants with a capacity of 18.9 MW (Transcarpathian region)
-
Two wind power plants of 150 MW each
-
Two wind power plants with a capacity of 50-150 MW
-
Wind power plant 100 MW (Kyiv region)
-
Wind power plant 100 MW (Odesa region)
-
Wind power plant 15 MW (Ivano-Frankivsk region)
-
Wind power plant 150 MW (Odesa region)
-
Wind power plant 21 MW (Cherkasy region)
-
Wind power plant of 100 MW (Odessa region)
-
Wind power plant of 150 MW (Zaporizhia region)
-
Wind power plant of 300 MW (Nikolaev region)
-
Wind power plant up to 1000 MW near the 750 kV substation "Kyivska" (Kyiv region)
-
Wind power plant up to 150 MW (Vinnytsia region)
-
energy storage system 1 MW (Zaporizhia region)
News
-
10 interesting facts about "green energy"
-
10 the largest solar power plants (SPP) in the world
-
2023 | Exhibitions, seminars and forums in the energy sphere INKNET
-
2024 | Exhibitions, seminars and forums in the energy sector | ICNET
-
2025 | Exhibitions, seminars and forums in the energy sector | IKNET
-
2026 | Exhibitions and forums in the energy sector | ICNET
-
A breath of fresh air for alternative energy in Ukraine
-
Alternative energy projects in agrobusiness: Now is the time to act
-
At first in the Kyiv region in Ukraine the electricity will produce from waste
-
Discussion of connection procedure to the electrical grids
-
Energy Business Diary
-
Energy storage systems - a popular trend or a critical necessity in Ukrainian realities
-
EuroCape New Energy Limited is planning to build a high-capacity wind power plant in Zaporozhye region.
-
Events, exhibitions and conferences in Ukrainian energy sector
-
General contract
-
Green-tariff
-
Grid connection from 1 January 2013
-
Happy Holy Trinity and Green Holidays!
-
Happy birthday IKNET
-
Happy energy
-
Happy energy 2021
-
Hooked by the sun
-
How the state provides incentives or "stimuli" for the development of highly manoeuvrable generation (HMG). Part 3
-
How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1:
-
How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2
-
How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 4
-
How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 5:
-
IKNET acted as a participant of elcomUkraine 2013
-
IKNET has updated its diary
-
In 5 years, the grafen revolution will take place
-
In Velykobereznianskyi district Zakarpatsky region, near the village Tykhyi was opened a new gas field.
-
Interview of expert "IKNET" - "Public Radio"
-
Legislation and rules in Ukrainian energy sector
-
NERC has provided the first "green" tariff including "local content"
-
Net Energy Metering
-
Obtained another "green" tariff for electricity generated from biogas
-
Practical seminar "green energy in agriculture - how to build a business on the biomass combustion and biogas extraction
-
Prepare for winter tariffs in summer
-
Purchase power engineer notebook for special price 300 uah
-
Reduce your bills for electricity
-
Review of changes in the implementation of UZE projects (Law of Ukraine No. 8172)
-
September, 16-17, the 2nd International Conference “Energy Efficiency in Industry and agribusiness” will be held
-
September, 22-24, the XIII International Trade Fair Power Engibeering Industry – 2015 will be held
-
Solar energy activities in Ukraine. Barriers and prospects for further development
-
The Past and Future of Energy in Ukraine: A History of Change
-
The first "green" tariffs for electricity generated at biogas power plants are in action in Ukraine
-
The largest nuclear power plants in the world
-
The most powerful power plant
-
The most powerful renewable energy projects in 2011
-
Today IKNET company celebrates its sixth birthday
-
Top 10 battery energy storage (BESS) installations in Europe by capacity (2025)
-
Top 10 battery energy storage (BESS) installations in the world by capacity (2025)
-
Top 10 hydroelectric and PSPPs in Europe (2025)
-
Top 10 largest wind farms in Europe (2025)
-
Top 10 nuclear power plants in Europe (2025)
-
Ukraine's Energy Sector. Results 2015
-
Ukraine's Energy Sector. Results IKNET company 2015
-
Ukrainian energy market
-
We strive to provide an understanding that it is possible and necessary to work in the UZE market, – IKNET director Yuriy Podolyak
-
What’s interesting on elcomUkraine 2016?
-
Would you like to save 3 thousand UAH. per month on heating your home?
-
Yuriy Podolyak: "UZEs open a new era of stability and flexibility of the energy system"
-
Створено Асоціацію Проєктування та Інжинірингу України
-
Турнір з настільного тенісу — (TableTennisCUP 2025)завершено!
-
Юрій Подоляк: ІНВЕСТОРАМ ПОТРІБНА ПІДТРИМКА
-
Яким чином ви здійснюєте контроль роботи сонячної станції?
Blog