Cogeneration plant for combined production of electric and thermal energy from mine gas with a capacity of 3.2 MW (Sukhodolsk, Lugansk region).

Construction of a cogeneration unit (СHP) for combined production of electric and thermal energy from mine gas at the mine site. The installed capacity of the CHP is 3.2 MW.

Works executed by IKNET:

  • the audit of the project for the purpose of analyzing the adequacy and the content of the permit documentation required for connection of CHP to an external power grid and putting it into operation;
  • three variants of the project implementation were developed and a list of all necessary measures for each of the options was provided.