News

How the state provides incentives or

How the state provides incentives or "stimuli" for the development of highly manoeuvrable generation (HMG). Part 3

02.05.2024

How the state provides incentives or "stimuli" for the development of highly manoeuvrable generation (HMG). Part 3: Where to find reserves in existing generation? Currently, biogas plants with a total capacity of hundreds of MW are operating in the energy market. The exact capacity of the State Enterprise "Guaranteed Buyer" is not yet publicised. These plants operate at a feed-in tariff and supply electricity to the grid on a regular schedule throughout the day. The plants have 5 years left to operate at the green tariff. A big advantage of biogas pow

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2

30.04.2024

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2: The optimal market for HMP operation is the ancillary services market (ASM). That is, the market where shunting generation and SPG are needed to maintain/restore frequency. And frequency is a key factor in electricity quality. Until mid-2023, an essential condition for certification to operate in the DSO market was the capacity of the facility - from 20 MW. Almost a year since this condition was changed! Now any plant from 1 MW can operate in th

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1:

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1:

29.04.2024

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1: Gas turbine (GTU) and gas piston units (GPU) are the only fast technical tools for the implementation of shunting power generation. Therefore, the CMU Resolution No. 222 of 06.03.2022 was amended to impose special obligations on natural gas market participants, namely: 1. Until 31.08.2024, NJSC Naftogaz of Ukraine purchases natural gas at a price of UAH 7,240 per 1000 cubic metres for electricity producers. 2. Until 31.08.2024, NJ

Exhibitions 2024

Exhibitions 2024

29.02.2024

March 20-21, 2024 Pochayna Event Hall Ukraine, Kyiv, Stepana Bandera Avenue, 23 Smart Building 2024 International Forum Smart Building - international professional exhibition and conference May 14-16,

IKNET has updated its diary

IKNET has updated its diary

26.02.2024

Moving with the times, IKNET has updated and improved its blog. Updating useful information can be especially useful for those interested in in modern energy technologies. The compact size makes the diary easy to use and convenient, and a pocket in the middle and a for a pen adds to its practicality.

Show more