76.5 MW wind power plant (Odessa region)

Essence of the Project: carrying out a technical audit of documentation for the construction of a wind power plant of 76.5 MW near town Yuzhne, Odesa region.

Works executed by IKNET: audit of existing documents, which are necessary for determining the cost of producing electric power of a wind power plant 76.5 MW.