Essence of the project: determination of the impact of connecting an energy storage unit (ESU) with an installed capacity of 20 MW/ capacity of 40 MWh.
Scope of IKNEТ work:
- development of project documentation for calculating the connection of a 20 MW/40 MWh energy storage unit to the 10 and 35 kV power grid;
- the project documentation was approved by NPC Ukrenergo.