Company's Projects

Energy storage unit 20 MW/40 MWh

Energy storage unit 20 MW/40 MWh

17.05.2024

Essence of the project: determination of the impact of connecting an energy storage unit (ESU) with an installed capacity of 20 MW/ capacity of 40 MWh. Scope of IKNEТ work:     development of project documentation for calculating the connection of a 20 MW/40 MWh energy storage unit to the 10 and 35 kV power grid;     the project documentation was approved by NPC Ukrenergo.

Scheme for the long-term development of the distribution system until 2032

Scheme for the long-term development of the distribution system until 2032

13.05.2024

Project description: implementation of the scheme for the long-term development of 20 (35) kV and above for the period from 2023 to 2032 at DTEK DNEPR ELECTRONIC NETWORKS JSC. Works performed by IKNET:     forecasting the levels of electricity consumption and load for winter and summer for the period 2022-2032;     actual and prospective volumes of electricity generated by generating facilities were determined;     analysis of the existing state of substations, th

Wind power plant up to 1000 MW near the 750 kV substation

Wind power plant up to 1000 MW near the 750 kV substation "Kyivska" (Kyiv region)

30.06.2022

-

Wind power plant 100 MW (Kyiv region)

Wind power plant 100 MW (Kyiv region)

30.06.2022

The essence of the project: construction of wind turbines, which will be located in Belotserkovsky district of Kyiv region Selection of the optimal connection option and capacity of wind turbines.   Completed works of IKNET: developed TER "Connection of a new wind farm in the Belotserki district of the Kyiv region"; The TER is under approval by NEC &

Wind power plant up to 150 MW (Vinnytsia region)

Wind power plant up to 150 MW (Vinnytsia region)

30.06.2022

The essence of the project:to develop a scheme for issuing the power of wind turbines up to 150 MW, construction which is planned on the territory of the Vinnytsia region.   Completed works of IKNET: the development of a feasibility study of the wind power generation scheme is indicative power up to 150 MW located on the territory of Vinnytsia region; The feas

Two wind power plants with a capacity of 50-150 MW

Two wind power plants with a capacity of 50-150 MW

30.06.2022

The essence of the project:preliminary determination of the possibility of connecting two wind power plants to the electrical grid of Ukraine 50-150 MW. Completed works of IKNET:a technical audit of the regions provided by the Customer was carried out in order to determine the possibility of connecting wind turbines to 330 kV substations with a minimum amount of their reconstruction.

Wind power plant 150 MW (Odesa region)

Wind power plant 150 MW (Odesa region)

29.06.2022

The essence of the project: to develop a scheme for issuing the power of wind turbines up to 150 MW, the construction of which is planned on the territory of the Odesa region. Completed works of IKNET: development of a feasibility study of the power generation scheme of wind power plants with an estimated capacity of up to 150 MW located in the Odesa region; The feasibili

Wind power plant 100 MW (Odesa region)

Wind power plant 100 MW (Odesa region)

29.06.2022

The essence of the project: joining the wind power plant, the construction of which is planned on the territory of the Dobroslav settlement community of the Odesa region. Completed works of IKNET: developed TER "Scheme of output of 100 MW wind turbine capacity on the territory of the Dobroslav settlement community in the Odesa district of the Odesa region"; The

Provider of commercial accounting services (ASKOE) of energy facilities

Provider of commercial accounting services (ASKOE) of energy facilities

29.06.2022

The essence of the project: service of ASKOE and transfer of data to SE "Guaranteed Buyer". Completed works of IKNET: Obtaining a PPKO license (EIS code: 62X289598939177F) to perform the role of commercial accounting data operator (ODCO), commercial accounting equipment operator (OZKO) and meter reading operator (OMD). Transfer of data to the commercial accounti

Forecasting electricity generation

Forecasting electricity generation

29.06.2022

-

50 MW / 100 MW × energy storage system

50 MW / 100 MW × energy storage system

29.06.2022

-

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

The scheme of perspective development of distribution system till 2029

The scheme of perspective development of distribution system till 2029

29.06.2022

-

Construction of a new 220 kV substation with 160 MVA transformers

Construction of a new 220 kV substation with 160 MVA transformers

29.06.2022

-

75 MW steel shop

75 MW steel shop

29.06.2022

-

Cogeneration unit 12.1 MW

Cogeneration unit 12.1 MW

29.06.2022

-

Thermal power plant with a capacity of 6 MW (Kyiv region)

Thermal power plant with a capacity of 6 MW (Kyiv region)

28.06.2022

-

Scheme of perspective development of the distribution system until 2031

Scheme of perspective development of the distribution system until 2031

28.06.2022

-

energy storage system 1 MW (Zaporizhia region)

energy storage system 1 MW (Zaporizhia region)

28.06.2022

-

Two solar power plants 4900 kW each (Zaporizhia region)

Two solar power plants 4900 kW each (Zaporizhia region)

09.03.2021

Project description: construction of two solar power plants with a capacity of 4900 kW each, located in the Yakymivskyi district of Zaporizhia region.

Wind power plant of 150 MW (Zaporizhia region)

Wind power plant of 150 MW (Zaporizhia region)

08.03.2021

Project description: performing calculations of repair and repair and emergency modes of operation of electrical networks 110/150 and higher, when implementing the connection of a wind power plant with a capacity of 150 MW, the construction of which is planned in the Berdyansk district of the Zaporizhya region. Scope of

Wind power plant 15 MW  (Ivano-Frankivsk region)

Wind power plant 15 MW (Ivano-Frankivsk region)

08.03.2021

Project description: construction of a 15 MW wind power plant near Yaremche, Ivano-Frankivsk region. Scope of IKNET: development of a preliminary feasibility study: assessment of the possibility of power supply to the network; the presence of environmental restrictions; preliminary installation of wind turbines on site and assessment of production.

Two wind power plants of 150 MW each

Two wind power plants of 150 MW each

08.03.2021

Project description: construction of two wind power plants with a capacity of up to 150 MW each with connection to the electric networks of the UES of Ukraine. Scope of IKNET: conducting a technical audit to determine the possibility of connecting to the electricity grids of the UES of Ukraine; analysis of 220-330 kV main substations in 17 regions of Ukraine.

Wind power plant of 300 MW (Nikolaev region)

Wind power plant of 300 MW (Nikolaev region)

08.03.2021

Project description: realization of the project of wind power plant of 300 MW in the Mykolaiv area. Scope of IKNET: conducting a technical audit (due diligence) of the project: assessment of wind potential; consideration of proposals for turbines and construction works; analysis of design solutions; environmental aspects;

Wind power plant of 100 MW (Odessa region)

Wind power plant of 100 MW (Odessa region)

08.03.2021

Project description: implementation of a 100 MW WPP project in the Odessa region.   Scope of IKNET: Customer's technical consultant: ana

Wind power plant 21 MW (Cherkasy region)

Wind power plant 21 MW (Cherkasy region)

08.03.2021

Project description:  construction of a wind power plant with a capacity of 21 MW, which is planned to be located in Chyhyryn district of Cherkasy region.     Scope of IKNET: analysis of electrical networks in order to determine the most optimal connecti

72 MW wind power plant (Rivne region)

72 MW wind power plant (Rivne region)

08.03.2021

Project description: construction of a 72 MW wind power plant near the Dovgovolya village, Volodymyretsky district, Rivne region. Scope of IKNET: a feasibility study was developed for the power delivery scheme of a wind power plant with a projected capacity of 72 MW in order to analy

Three wind power plants with a total capacity of up to 180 MW (Zhytomyr region)

Three wind power plants with a total capacity of up to 180 MW (Zhytomyr region)

08.03.2021

Project description: construction of three wind power plants with a total capacity of up to 180 MW in the Zhytomyr region. Scope of IKNET:   the feasibility study of the scheme of power supply of three wind power plants with a total capacity of up to 180

Three wind power plants with a capacity of up to 120 MW (Zhytomyr region)

Three wind power plants with a capacity of up to 120 MW (Zhytomyr region)

08.03.2021

Project description:  construction of three wind power plants with a total capacity of up to 120 MW in the Zhytomyr region. Scope of IKNET: the feasibility study of the scheme of power supply of three wind farms with a total capacity of

Traction substation 150/35/10 kV

Traction substation 150/35/10 kV "Yakymivka" (Zaporizhzhya region)

08.03.2021

Project description: technical re-equipment of the 150/35/10 kV traction substation "Yakymivka" in the part of 10 kV closed switchgear for power supply of two solar power plants with a capacity of 4900 kW each, which are located on the territory of Yakymivka village council of Yakymivka district of Zaporizhia region outside the settlement.  

Scheme of perspective development of the distribution system until 2030

Scheme of perspective development of the distribution system until 2030

08.03.2021

Project description: implementation of the scheme of perspective development of the distribution system of 20 (35) kV and higher for the period from 2021 to 2030 of JSC DTEK Dniprovsky Elektromerezhi.   Scope of IKNET: forecast of levels of electricity consumption and load for winter and summer for the period 2021-2030; actual and prospective volumes of electricity generat

Turbogenerator with condenser turbine 23,751 MW (Kirovograd region)

Turbogenerator with condenser turbine 23,751 MW (Kirovograd region)

03.02.2021

Project description: connection to external power grids of a turbine generator with a condensing turbine with a capacity of 23.751 MW. Scope of IKNET: development and approval of a working design for the new construction of 35 kV cable

Cogeneration unit 13.16 MW (Kirovograd region)

Cogeneration unit 13.16 MW (Kirovograd region)

03.02.2021

Project description: completion of the working project for the reconstruction and completion of the energy complex of the industrial CHP by installing a higher capacity turbine unit in Kropyvnytskyi. Scope of IKNET: development of the p

Electricity market analysis

Electricity market analysis

03.02.2021

Project description: consideration and analysis of legislative aspects in the field of electricity of Ukraine. Scope of IKNET: analysis of the solar energy sector, in particular the conditions for the sale of electrical energy from SPP for own consumption; analysis of the structure of electricity consumption and the largest consumers of electricity in Ukraine; consideration o

Two solar power plants with a capacity of 18.9 MW (Transcarpathian region)

Two solar power plants with a capacity of 18.9 MW (Transcarpathian region)

03.02.2021

Project description: construction of solar power plants with a capacity of 9 and 9.8 MW, located in the Transcarpathian region. Scope of IKNET: verification of design decisions of the technological part of SPP and GRP 35 kV, which a

Six solar power plants with a total capacity of 60.5 MW

Six solar power plants with a total capacity of 60.5 MW

03.02.2021

Project description: Full pre-investment technical audit of operating solar power plants in Dnepropetrovsk, Kherson and Vinnytsia regions.   Scope of IKNET: technical audit (due diligence) of existing solar power plants

Four solar power plants with a total capacity of 55.5 MW (Zhytomyr and Dnipropetrovsk regions)

Four solar power plants with a total capacity of 55.5 MW (Zhytomyr and Dnipropetrovsk regions)

03.02.2021

Project description: implementation of projects of 14 MW and 20 MW in Dnipropetrovsk region and 9.5 MW and 12 MW in Zhytomyr region.   Scope of IKNET: technical audit of projects: consideration and analysis of documents required for the implementation of the connection of SPP to power grids, technical conditions for non-standard connection to power grids of photovoltaic solar power plants in terms of their su

Solar power plant 40 MW (Cherkasy region)

Solar power plant 40 MW (Cherkasy region)

03.02.2021

Project description: construction of a solar power plant with a capacity of 40 MW in Chyhyryn district of Cherkasy region.   Scope of IKNET: determination of the sufficiency of documents for the design of the SPP power generation scheme; analysis of the developed design solutions according to the SPP power supply scheme; providing recommendations and conclusions r

Solar power plant 32 MW (Kiev region)

Solar power plant 32 MW (Kiev region)

03.02.2021

Project description:  construction of a 32 MW solar power plant, which is planned to be located in Rokytniansky district of Kyiv region.   Scope of IKNET: development of the project of the technological part of SPP and GRP 35 kV;

Solar power plant 2 MW (Kiev region)

Solar power plant 2 MW (Kiev region)

03.02.2021

Project description:  construction of a solar power plant with a capacity of 2 MW, which is planned to be located in Borodyansky district of Kyiv region.     Scope of IKNET: development of the project of the techn

Solar power plant 4 MW (Kiev region)

Solar power plant 4 MW (Kiev region)

03.02.2021

Project description: construction of a 4 MW solar power plant, which is planned to be located in Boryspil district of Kyiv region. Scope of IKNET: development of the project of the technological part of the solar power plant;

Solar power plant 4.95 MW (Dnipropetrovsk region)

Solar power plant 4.95 MW (Dnipropetrovsk region)

03.02.2021

Project description: construction of a 4.95 MW solar power plant, which is planned to be located in the Pavlogradsky district of the Dnipropetrovsk region. Scope of IKNET: development of a working project of telemechanics and communication.

Solar power plant 170 MW  (Dnipropetrovsk region)

Solar power plant 170 MW (Dnipropetrovsk region)

03.02.2021

Project description: assessment of the obtained technical conditions, search for optimized options for connecting a 170 MW SPP. Scope of IKNET: assessment of the existing electrical network and the search for alternative options for the

Five solar power plants 925 kW each (Zhytomyr region)

Five solar power plants 925 kW each (Zhytomyr region)

03.02.2021

Project description: construction of five solar power plants with a capacity of 925 kW each in the Mykolaivka village of the Novograd-Volynsky region of the Zhytomyr region.    

Solar power plant 975 kW (Poltava region)

Solar power plant 975 kW (Poltava region)

03.02.2021

Project description: Legal support in the implementation of the project for the construction of a ground-based photovoltaic solar power plant located in the town of Grebinka, Poltava region. Scope of IKNET: consulting support for the imple

Solar power plant 0.78 MW (Kharkiv region)

Solar power plant 0.78 MW (Kharkiv region)

03.02.2021

Project description:  Technical audit of the design documentation of a solar power plant with an installed capacity of 0.78 MW, the construction of which is planned in Andriyivka village, Balakliisky district, Kharkiv region.    

Solar power plant 2.475 kW (Zhytomyr region)

Solar power plant 2.475 kW (Zhytomyr region)

30.12.2019

Essence of the Project: construction of a solar power plant with a capacity of 2.475 MW in Zhytomyr region.

25 MW wind power plant (Mykolaiv region)

25 MW wind power plant (Mykolaiv region)

18.12.2019

Essence of the Project: Construction of a 25 MW wind power plant within Parutynska and Ostrivska village councils of Ochakivsky district, Mykolaiv regiont. Works executed by IKNET: The feasibility study "The scheme of power output of a 25 MW wind powe

150 MW wind power plant (Donetsk region)

150 MW wind power plant (Donetsk region)

18.12.2019

Essence of the Project: construction of a wind power plant with a capacity of 150 MW in the area of Kramatorsk, Donetsk region.   Works executed by IKNET: The feasibility study of power increase and the scheme of connection of Kramatorsk wind power station with 66 MW to 150 MW located in t

25.2 and 50.4 MW wind and solar power plant (Ivano-Frankivsk region)

25.2 and 50.4 MW wind and solar power plant (Ivano-Frankivsk region)

18.12.2019

Essence of the Project: construction of wind and solar power plants with capacity of 25.2 and 50.4 MW in Ivano-Frankivsk region.   Works executed by IKNET: The feasibility study "The scheme of power output of a solar power plant with

300 MW wind power plant (Kiev region)

300 MW wind power plant (Kiev region)

18.12.2019

Essence of the Project: construction of a wind power plant with capacity up to 300 MW in the Kyiv region.   Works executed by IKNET: The feasibility study "The scheme of power output of a wind power plant with the capacity up to 300 MW near the displaced village of Leliv, Ivankiv

40.5 MW wind power plant (Kiev region)

40.5 MW wind power plant (Kiev region)

18.12.2019

Essence of the Project: construction of a 40.5 MW wind power plant in the Kyiv region.   Works executed by IKNET: The feasibility study "The scheme of power output of 40.5 MW wind power plant near the displaced village of Leliv, Ivankiv district of the Kyiv region" was developed; The feasibility study

22.4 MW wind power plant (Odessa region)

22.4 MW wind power plant (Odessa region)

17.12.2019

Essence of the Project: construction of a wind power plant with a capacity of 22.4 MW in Odesa region.   Works executed by IKNET: The feasibility study "The scheme of power output of the Baltsk WPP with the capacity of 22.4 MW within the limits o

9.9 MW solar power plant (Kyiv region)

9.9 MW solar power plant (Kyiv region)

17.12.2019

Essence of the Project: the construction of a 9.9 MW solar power plant on the territory of the Dymerka village council of the Vyshgorod district of the Kyiv region.   Works executed by IKNET: organization of receiving TS on connection of PVP with capacity of 9.9 MW in PJSC "Kyivoblenergo"; development and appr

Show more