Project description: construction of three wind power plants with a total capacity of up to 180 MW in the Zhytomyr region.
Scope of IKNET:
- the feasibility study of the scheme of power supply of three wind power plants with a total capacity of up to 180 MW in the Zhytomyr region was developed;
- feasibility study agreed in JSC "Zhytomyroblenergo".