The essence of the project: to develop a scheme for issuing the power of wind turbines up to 150 MW, the construction of which is planned on the territory of the Odesa region.
Completed works of IKNET:
- development of a feasibility study of the power generation scheme of wind power plants with an estimated capacity of up to 150 MW located in the Odesa region;
- The feasibility study is under approval at the NEC "Ukrenergo".
(1).png)