Project description: construction of a wind power plant with a capacity of 21 MW, which is planned to be located in Chyhyryn district of Cherkasy region.
Scope of IKNET: analysis of electrical networks in order to determine the most optimal connection scheme and installed capacity of wind power plant in Cherkasy region.