Project description: connection to external power grids of a turbine generator with a condensing turbine with a capacity of 23.751 MW.
Scope of IKNET:
- development and approval of a working design for the new construction of 35 kV cable lines for connecting the cogeneration unit to the electricity grid;
- calculation of the impact of a turbogenerator with a condenser turbine on the modes of operation of the electrical network of the UES of Ukraine;
- approval of settlements in NEC "Ukrenergo" and PJSC "Kirovogradoblenergo".