Scheme for the long-term development of the distribution system until 2032
13.05.2024
Project description: implementation of the scheme for the long-term development of 20 (35) kV and above for the period from 2023 to 2032 at DTEK DNEPR ELECTRONIC NETWORKS JSC. Works performed by IKNET: forecasting the levels of electricity consumption and load for winter and summer for the period 2022-2032; actual and prospective volumes of electricity generated by generating facilities were determined; analysis of the existing state of substations, th