Traditional energy

Scheme for the long-term development of the distribution system until 2032

Scheme for the long-term development of the distribution system until 2032

13.05.2024

Project description: implementation of the scheme for the long-term development of 20 (35) kV and above for the period from 2023 to 2032 at DTEK DNEPR ELECTRONIC NETWORKS JSC. Works performed by IKNET:     forecasting the levels of electricity consumption and load for winter and summer for the period 2022-2032;     actual and prospective volumes of electricity generated by generating facilities were determined;     analysis of the existing state of substations, th

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

The scheme of perspective development of distribution system till 2029

The scheme of perspective development of distribution system till 2029

29.06.2022

-

Construction of a new 220 kV substation with 160 MVA transformers

Construction of a new 220 kV substation with 160 MVA transformers

29.06.2022

-

75 MW steel shop

75 MW steel shop

29.06.2022

-

Thermal power plant with a capacity of 6 MW (Kyiv region)

Thermal power plant with a capacity of 6 MW (Kyiv region)

28.06.2022

-

Scheme of perspective development of the distribution system until 2031

Scheme of perspective development of the distribution system until 2031

28.06.2022

-

Traction substation 150/35/10 kV

Traction substation 150/35/10 kV "Yakymivka" (Zaporizhzhya region)

08.03.2021

Project description: technical re-equipment of the 150/35/10 kV traction substation "Yakymivka" in the part of 10 kV closed switchgear for power supply of two solar power plants with a capacity of 4900 kW each, which are located on the territory of Yakymivka village council of Yakymivka district of Zaporizhia region outside the settlement.  

Scheme of perspective development of the distribution system until 2030

Scheme of perspective development of the distribution system until 2030

08.03.2021

Project description: implementation of the scheme of perspective development of the distribution system of 20 (35) kV and higher for the period from 2021 to 2030 of JSC DTEK Dniprovsky Elektromerezhi.   Scope of IKNET: forecast of levels of electricity consumption and load for winter and summer for the period 2021-2030; actual and prospective volumes of electricity generat

Show more