• Analysis of the implementation of alternative energy projects. Part 2

    Analysis of the implementation of alternative energy projects. Part 2

    5.10.2017

    Interesting information for those who is interested in analytics and statistics. International organizations are watching closely what is going on in the world in the context of the implementation of alternative energy programs. Second part. First part here.   Based on the materials of site https://www.iea.org/publications/wei2017/   Energy Efficiency Growing investment into energy efficiency Investment in energy efficiency once again expanded, despite persistently l...

  • Analysis of the implementation of alternative energy. Part 1

    Analysis of the implementation of alternative energy. Part 1

    4.10.2017

    Interesting information for those who is interested in analytics and statistics. International organizations are watching closely what is going on in the world in the context of the implementation of alternative energy programs. First part. Second part here. Based on the materials of site https://www.iea.org/publications/wei2017/     World Energy Investment 2017 Energy investment by sector Total energy investment worldwide in 2016 was just over $1.7 trillion, ac...

  • Funding programs of alternative energy

    Funding programs of alternative energy

    21.07.2017

    The main financial institutions, organizations and funds that provide loans and finance energy saving projects in the country include: World Bank; European Bank of Reconstruction and Development (EBRD); The Nordic Environment Finance Corporation (NEFCO); Eastern Europe Energy Efficiency and Environment Partnership (E5P) U.S. Agency for International Development (USAID); Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH; The Sw...

  • Electricity market. Changes in legislation.

    Electricity market. Changes in legislation.

    11.07.2017

    The Law of Ukraine "On the Electricity Market" has recently entered into force. Are we fully aware of what awaits us with its adoption? In accordance with the provisions of this Law, the operation of the New Electricity Market begins from July 1, 2019. The participants of the New Market are: electricity producers, electricity supplier, market operator, trader, consumer, guaranteed buyer (currently SE “Energorynok”), transmission system operator (currently NEC ...

  • Solar roof

    Solar roof

    17.02.2017

    Solar energy industry is not standing still, and do always adapts to the new "whims" of the consumer market. In particular, is increasingly being used frameless mono- and polycrystalline solar panels of II generation glass / glass. Warranty period of panels – 30 years with a capacity of 90%. Currently, the range of panels installed capacity of 250-260 W. It should also be noted that the combination of solar panels with a power optimizer solar panels and mounts ...

  • Top-3 tips for choosing panels

    Top-3 tips for choosing panels

    7.09.2016

    This page is available only in Russian and Ukrainian  

  • Biogas production

    Biogas production

    6.09.2016

    This page is available only in Russian and Ukrainian

  • Why do we need biogas stations in Ukraine?

    Why do we need biogas stations in Ukraine?

    5.09.2016

    Biogas is a gas that mainly consists of methane (CH4) which is produced from biomass. It should be noted that various kinds of biomass (in particular the various household and industrial wastes of organic origin) could be used for biogas production. The main method for the biogas production is an anaerobic fermentation of the biomass. The method of biogas production clearly determines the set of main equipment that should be installed at the biogas plant; should there be installe...

  • The nuances is essential to know while connecting private solar power plant (SPP) to the power grids of Oblenergo

    The nuances is essential to know while connecting private solar power plant (SPP) to the power grids of Oblenergo

    31.08.2016

    No wonder people say: "Forewarned is forearmed" as there are many obstacles that can confront private home owner who has decided to build a private SPP. We can share some of them on the basis of the experience gained. OBTAINING OF THE LICENCE The big advantage for implementation of private SPP is the lack of requirements for obtaining a license to produce electricity. Construction of private SPP differs significantly with the lower cost and smaller scope of work requi...

  • Different types of accumulators

    Different types of accumulators

    26.08.2016

    At the solar and wind power plants (SPP / WPP) an accumulator batteries (ACB) accumulate electricity during the day and store its surplus. Using ACB it is possible to ensure own house with an autonomous power supply, for example: -    with aim to use the electric power which has been accumulated during the daylight hours at night or at the periods of windless weather; -    in the cases of frequent disconnections from the power grid or during the hours w...

Simple solutions for complex tasks