28.11.2024
28.11.2024
10.06.2024
03.06.2024
How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 5: Our theses, the implementation of which will give a strong impetus to the development of HMG in Ukraine: 1. Improvement of the Land Code, namely: The construction of WTGs can be carried out on land plots of any land category and/or type of designated purpose. 2. Improvement of the Law “On Finance...”, namely: to provide financial institutions with the opportunity to provide project financing for WTG and
31.05.2024
How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 4: As of now, we record what incentives for HHG have been recently provided by the state: 1. Setting a fixed gas price at UAH 16500 including VAT per 1000 cubic meters of gas https://zakon.rada.gov.ua/laws/s
02.05.2024
How the state provides incentives or "stimuli" for the development of highly manoeuvrable generation (HMG). Part 3: Where to find reserves in existing generation? Currently, biogas plants with a total capacity of hundreds of MW are operating in the energy market. The exact capacity of the State Enterprise "Guaranteed Buyer" is not yet publicised. These plants operate at a feed-in tariff and supply electricity to the grid on a regular schedule throughout the day. The plants have 5 years left to operate at the green tariff. A big advantage of biogas pow
30.04.2024
How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2: The optimal market for HMP operation is the ancillary services market (ASM). That is, the market where shunting generation and SPG are needed to maintain/restore frequency. And frequency is a key factor in electricity quality. Until mid-2023, an essential condition for certification to operate in the DSO market was the capacity of the facility - from 20 MW. Almost a year since this condition was changed! Now any plant from 1 MW can operate in th
29.04.2024
How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1: Gas turbine (GTU) and gas piston units (GPU) are the only fast technical tools for the implementation of shunting power generation. Therefore, the CMU Resolution No. 222 of 06.03.2022 was amended to impose special obligations on natural gas market participants, namely: 1. Until 31.08.2024, NJSC Naftogaz of Ukraine purchases natural gas at a price of UAH 7,240 per 1000 cubic metres for electricity producers. 2. Until 31.08.2024, NJ
29.02.2024
March 20-21, 2024 Pochayna Event Hall Ukraine, Kyiv, Stepana Bandera Avenue, 23 Smart Building 2024 International Forum Smart Building - international professional exhibition and conference May 14-16,
26.02.2024
Moving with the times, IKNET has updated and improved its blog. Updating useful information can be especially useful for those interested in in modern energy technologies. The compact size makes the diary easy to use and convenient, and a pocket in the middle and a for a pen adds to its practicality.
13.04.2023
It has been more than a year since the active phase of the war with Russia began, which was not limited to the territory of Ukraine but also extended to the struggle for control over the power grids. The date of February 24, 2022, was not only the day of Russia's attack on Ukraine, but also the beginning of the Ukrainian power system's operation in isolation from the power systems of Russia and Belarus. In March 2022, Ukraine's power system was synchronized with the European power grid ENTSO-E. President of Ukraine Volodymyr Zelenskyy noted that this step allowed
25.03.2023
September 21-22, 2023
28.02.2023
-
21.02.2022
April 5-7, 2022 Ukraine, Kyiv, International Exhibition Center, 15 Brovarsky avenue, Livoberezhna metro station XIV International specialized exhibition "KIEV TECHNICAL FAIR-2022"
04.02.2021
Laws of Ukraine zakon2.rada.gov.ua/ Ministry of Energy and Coal Industry of Ukraine mpe.kmu.gov.ua/ NPC Ukrenergo, SE https://ua.energy/en/ Market operator, SE https://www.oree.com.ua/?lang=english
04.05.2020
-
21.12.2019
20.11.2017
16.08.2017
At least a word on "green" tariff Ask a couple of questions to youself…. How much costs are needed to spend on the production and sale of a liter of milk, or a kilogram of wheat, etc.? And what if we calculate all the steps of the technological process? If we, at the each step of production deduct a consumption costs for electricity? According to inaccurate calculations, with the full understanding of what we consider to be very superficial, the fact is that these amount of this costs is significant. We do not take much in
08.08.2017
The Ukrainian energy market is changing rapidly. On the number of investors who visit our country we have no one to compare with. Investors attentively listen our experts, which explain how to implement energy projects in our country. In fact, we share experiences. When they ask questions about the algorithm of implementing the investment project, our experts give advises to possible partners. The largest information block is the regulatory issues. This mean that we explain how, from the point of view of procedural part, it is faster to start to get a positive result at the end
01.08.2017
28.07.2017
This page is available only in Russian and Ukrainian
10.07.2017
22.08.2016
This page is available only in Russian
22.08.2016
This page is available only in Russian
22.08.2016
This page is available only in Russian
22.08.2016
This page is available only in Russian
22.08.2016
This page is available only in Russian
22.08.2016
This page is available only in Russian
22.08.2016
This page is available only in Russian
22.08.2016
This page is available only in Ukrainian
22.08.2016
This page is available only in Ukrainian
22.08.2016
This page is available only in Ukrainian
22.08.2016
This page is available only in Ukrainian and Russian
10.06.2016
Offer value from 10 to 30 of June 2016 Our company is developing interesting and useful material - Power Engineer Notebook. This is undated notebook, which contains relevant information in an accessible format, particularly: the legislation in the field of electric energy producing from alternative sources ("green" tariff values
22.04.2016
Now in Kiev held the 20th jubilee international exhibition elcomUkraine 2016 in conjunction with the exhibitions: "GREENEXPO | Alternative power generation in 2016"," EIA: Electronics and Industrial Automation"," TechnoDrive "and" Independent power engineering ".
05.04.2016
Developed 192 project. Implemented connection of the facilities with total capacity of 7015 kW to the electric power grids. Obtained the "green" tariff for biogas power plant
04.04.2016
On 16 th of July 2015 Law of Ukraine "On Amendments to Some Laws of Ukraine regarding the maintenance of competitive conditions of electricity generation from alternative energy sources" came into force http://w1.c1.rada.gov.ua/pls/zweb2/webproc4_1?pf3511=55219
01.04.2016
Specialists of IKNET participated in the NKREKP meeting a round table on the topic "Problems arising during the electrical connection (objects) customers to electrical networks, and possible legislative regulation." We hope to make appropriate changes to the current legislation of Ukraine on procedure joining electrical http://www.nerc.gov.ua/?news=5048
18.03.2016
IKNET Company functions as the General contractor at the stage of execution of design, construction and installation works, while providing the following services: Project works, na
19.07.2015
Changes in Ukrainian legislation concerning connection to power networks Starting from 01.01.2013 will be introduced changes concerning payment (fee) for connection of electricity facilities to power networks (the Law of Ukraine “On Amendments to Some Laws of Ukraine on payment for connection of natural monopolies to power networks” dated 22.06.2012 No. 5021-VI). The Law of Ukraine “On electricity” defines the following types of connection: standard connection – less than 160 kW; ...
19.07.2015
At the regular session of NERC on 22/08/2013, "TIS Eco" Company obtained the "green" tariff at a rate of 1.61 UAH / KW • h for electricity generated at the biogas power plant. This is the second biogas project in Ukraine which has received the right to sell all of scope of the electricity in the Wholesale Market by the "green" tariff, taking into account individual coefficient of 2.3. The first such project has been implemented by LNK Company in Boryspil district, Kyiv region. Since 2009 "TIS Eco" Company implements the project of construction of 200 kW power plant
19.07.2015
Until quite recently, the conventional wisdom among many were that biogas as one of the "green" energy sectors of Ukraine cannot develop because the construction of biogas power plants requires a significant investment, and under the "green" tariffs, which are set for electricity from biogas such projects are simply unprofitable. Nevertheless, combined experience of the companies "LNK" and "EC NET" helps to eventually dispel these myths. In 2011, "LNK" company initiated projects of construction of the power plants fired by biogas from solid domestic waste (SDW) landfill
19.07.2015
Long-term experience of collaboration between EC NET Company and foreign investors shows that there are significant problems associated with implementation of alternative energy projects in Ukraine. Foremost it affects solar energy. Currently, there are several problems that significantly limit possibilities for further development of the solar energy. Being experts and practitioners in the field of conventional and alternative energy EC NET offers to review the main steps to be taken in order to help the Ukrainian market of renewable energy sources to solve problems at the leg
18.06.2015
This page is available only in Russian