News

2026 | Exhibitions and forums in the energy sector | ICNET

2026 | Exhibitions and forums in the energy sector | ICNET

28.10.2025

Дата Місце Подія Посилання March 6, 2026 Pochayna Event Hall Ukraine, Kyiv, Stepana Bandera Avenue, 23 Smart Building 2026 Internationa...

Yuriy Podolyak:

Yuriy Podolyak: "UZEs open a new era of stability and flexibility of the energy system"

23.10.2025

https://www.iclub.energy/news/yuriy-podoliak-uze-vidkryvaiut-novu-epokhu-stabilnosti-ta-hnuchkosti-enerhosystemy/ November 20 in Kyiv Energy Club organizes the forum "Energy of Freedom: Sustainability and new ma

Energy storage systems - a popular trend or a critical necessity in Ukrainian realities

Energy storage systems - a popular trend or a critical necessity in Ukrainian realities

22.10.2025

Introduction Energy storage installations (UZE) or energy storage systems (СНЕ), or Battery Energy Storage System (ВЕСС) are rapidly gaining popularity all over the world - and Ukraine is no exception. This market in our country is already valued at hundreds of millions of euros and continues to grow. And so it's time to figure out what UZE is, how they are arranged, why this market is growing and what problems it faces. What is ultrasound, how are they arranged, what are they ...

We strive to provide an understanding that it is possible and necessary to work in the UZE market, – IKNET director Yuriy Podolyak

We strive to provide an understanding that it is possible and necessary to work in the UZE market, – IKNET director Yuriy Podolyak

19.10.2025

Energy storage installations will play a strategic role in stabilizing and providing flexibility to the energy system, the expert is confident. In the foreseeable future, energy storage systems (ESS) will play a strategic role in stabilizing and ensuring the flexibility of the United Energy System of Ukraine. Therefore, it is important today to give all stakeholders an understanding that it is both possible and necessary to work in this market, believes Yuriy Podolyak, head of IKNET, a comp

Top 10 battery energy storage (BESS) installations in the world by capacity (2025)

Top 10 battery energy storage (BESS) installations in the world by capacity (2025)

15.09.2025

  IKNET is an engineering company specializing in advanced solutions for the energy sector. We understand the importance of integrating modern technologies, particularly ...

Top 10 hydroelectric and PSPPs in Europe (2025)

Top 10 hydroelectric and PSPPs in Europe (2025)

12.09.2025

Hydropower remains the foundation of Europe’s energy security, providing stable electricity generation, grid flexibility, and support for the t...

Top 10 nuclear power plants in Europe (2025)

Top 10 nuclear power plants in Europe (2025)

10.09.2025

Today, Europe remains one of the world’s leaders in the field with powerful nuclear power plants supplying stable electricity to millions of ...

Top 10 battery energy storage (BESS) installations in Europe by capacity (2025)

Top 10 battery energy storage (BESS) installations in Europe by capacity (2025)

10.09.2025

IKNET is an engineering company specializing in advanced solutions for the energy sector. We understand

Top 10 largest wind farms in Europe (2025)

Top 10 largest wind farms in Europe (2025)

10.09.2025

IKNET is an engineering company and a leader in the field of engineering and implementation of energy projects in Ukraine, offering

2025 | Exhibitions, seminars and forums in the energy sector | IKNET

2025 | Exhibitions, seminars and forums in the energy sector | IKNET

05.09.2025

offlineDate Location Event Link

10.06.2025

31.03.2025

28.11.2024

10.06.2024

How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 5:

How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 5:

03.06.2024

How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 5: Our theses, the implementation of which will give a strong impetus to the development of HMG in Ukraine: 1. Improvement of the Land Code, namely: The construction of WTGs can be carried out on land plots of any land category and/or type of designated purpose. 2. Improvement of the Law “On Finance...”, namely: to provide financial institutions with the opportunity to provide project financing for WTG and

How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 4

How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 4

31.05.2024

How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 4: As of now, we record what incentives for HHG have been recently provided by the state: 1. Setting a fixed gas price at UAH 16500 including VAT per 1000 cubic meters of gas https://zakon.rada.gov.ua/laws/s

How the state provides incentives or

How the state provides incentives or "stimuli" for the development of highly manoeuvrable generation (HMG). Part 3

02.05.2024

How the state provides incentives or "stimuli" for the development of highly manoeuvrable generation (HMG). Part 3: Where to find reserves in existing generation? Currently, biogas plants with a total capacity of hundreds of MW are operating in the energy market. The exact capacity of the State Enterprise "Guaranteed Buyer" is not yet publicised. These plants operate at a feed-in tariff and supply electricity to the grid on a regular schedule throughout the day. The plants have 5 years left to operate at the green tariff. A big advantage of biogas pow

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2

30.04.2024

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2: The optimal market for HMP operation is the ancillary services market (ASM). That is, the market where shunting generation and SPG are needed to maintain/restore frequency. And frequency is a key factor in electricity quality. Until mid-2023, an essential condition for certification to operate in the DSO market was the capacity of the facility - from 20 MW. Almost a year since this condition was changed! Now any plant from 1 MW can operate in th

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1:

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1:

29.04.2024

How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1: Gas turbine (GTU) and gas piston units (GPU) are the only fast technical tools for the implementation of shunting power generation. Therefore, the CMU Resolution No. 222 of 06.03.2022 was amended to impose special obligations on natural gas market participants, namely: 1. Until 31.08.2024, NJSC Naftogaz of Ukraine purchases natural gas at a price of UAH 7,240 per 1000 cubic metres for electricity producers. 2. Until 31.08.2024, NJ

2024 | Exhibitions, seminars and forums in the energy sector | ICNET

2024 | Exhibitions, seminars and forums in the energy sector | ICNET

29.02.2024

March 20-21, 2024 Pochayna Event Hall Ukraine, Kyiv, Stepana Bandera Avenue, 23 Smart Building 2024 International Forum Smart Building - international professional exhibition and conference May 14-16,

IKNET has updated its diary

IKNET has updated its diary

26.02.2024

Moving with the times, IKNET has updated and improved its blog. Updating useful information can be especially useful for those interested in in modern energy technologies. The compact size makes the diary easy to use and convenient, and a pocket in the middle and a for a pen adds to its practicality.

The Past and Future of Energy in Ukraine: A History of Change

The Past and Future of Energy in Ukraine: A History of Change

13.04.2023

It has been more than a year since the active phase of the war with Russia began, which was not limited to the territory of Ukraine but also extended to the struggle for control over the power grids. The date of February 24, 2022, was not only the day of Russia's attack on Ukraine, but also the beginning of the Ukrainian power system's operation in isolation from the power systems of Russia and Belarus. In March 2022, Ukraine's power system was synchronized with the European power grid ENTSO-E. President of Ukraine Volodymyr Zelenskyy noted that this step allowed

2023 | Exhibitions, seminars and forums in the energy sphere INKNET

2023 | Exhibitions, seminars and forums in the energy sphere INKNET

25.03.2023

September 21-22, 2023 National complex "Expocentre

Review of changes in the implementation of UZE projects (Law of Ukraine No. 8172)

Review of changes in the implementation of UZE projects (Law of Ukraine No. 8172)

28.02.2023

-

Events, exhibitions and conferences in Ukrainian energy sector

Events, exhibitions and conferences in Ukrainian energy sector

21.02.2022

April 5-7, 2022 Ukraine, Kyiv, International Exhibition Center, 15 Brovarsky avenue, Livoberezhna metro station XIV International specialized exhibition "KIEV TECHNICAL FAIR-2022"

Legislation and rules in Ukrainian energy sector

Legislation and rules in Ukrainian energy sector

04.02.2021

Laws of Ukraine zakon2.rada.gov.ua/ Ministry of Energy and Coal Industry of Ukraine mpe.kmu.gov.ua/ NPC Ukrenergo, SE https://ua.energy/en/ Market operator, SE https://www.oree.com.ua/?lang=english

Happy birthday IKNET

Happy birthday IKNET

04.05.2020

-

Happy energy

Happy energy

21.12.2019

In 5 years, the grafen revolution will take place

In 5 years, the grafen revolution will take place

20.11.2017

Green-tariff

Green-tariff

16.08.2017

At least a word  on "green" tariff  Ask a couple of questions to youself…. How much costs are needed to spend on the production and sale of a liter of milk, or a kilogram of wheat, etc.? And what if we calculate all the steps of the technological process? If we, at the each step of production deduct a consumption costs for electricity? According to inaccurate calculations, with the full understanding of what we consider to be very superficial, the fact is that these amount of this costs is significant. We do not take much in

Ukrainian energy market

Ukrainian energy market

08.08.2017

The Ukrainian energy market is changing rapidly. On the number of investors who visit our country we have no one to compare with. Investors attentively listen our experts, which explain how to implement energy projects in our country. In fact, we share experiences. When they ask questions about the algorithm of implementing the investment project, our experts give advises to possible partners. The largest information block is the regulatory issues. This mean that we explain how, from the point of view of procedural part, it is faster to start to get a positive result at the end

Energy Business Diary

Energy Business Diary

01.08.2017

Today IKNET company celebrates its sixth birthday

Today IKNET company celebrates its sixth birthday

28.07.2017

This page is available only in Russian and Ukrainian

Interview of expert

Interview of expert "IKNET" - "Public Radio"

10.07.2017

The most powerful renewable energy projects in 2011

The most powerful renewable energy projects in 2011

22.08.2016

This page is available only in Russian

10 the largest solar power plants (SPP) in the world

10 the largest solar power plants (SPP) in the world

22.08.2016

This page is available only in Russian

Hooked by the sun

Hooked by the sun

22.08.2016

This page is available only in Russian

The largest nuclear power plants in the world

The largest nuclear power plants in the world

22.08.2016

This page is available only in Russian

The most powerful power plant

The most powerful power plant

22.08.2016

This page is available only in Russian

Alternative energy projects in agrobusiness: Now is the time to act

Alternative energy projects in agrobusiness: Now is the time to act

22.08.2016

This page is available only in Russian

IKNET acted as a participant of elcomUkraine 2013

IKNET acted as a participant of elcomUkraine 2013

22.08.2016

This page is available only in Russian

Reduce your bills for electricity

Reduce your bills for electricity

22.08.2016

This page is available only in Ukrainian 

A breath of fresh air for alternative energy in Ukraine

A breath of fresh air for alternative energy in Ukraine

22.08.2016

This page is available only in Ukrainian

Prepare for winter tariffs in summer

Prepare for winter tariffs in summer

22.08.2016

This page is available only in Ukrainian

Happy Holy Trinity and Green Holidays!

Happy Holy Trinity and Green Holidays!

22.08.2016

This page is available only in Ukrainian and  Russian

Purchase power engineer notebook for special price 300 uah

Purchase power engineer notebook for special price 300 uah

10.06.2016

Offer value from 10 to 30 of June 2016 Our company is developing interesting and useful material   - Power Engineer Notebook. This is undated notebook, which contains relevant information in an accessible format,  particularly: the legislation in the field of electric energy producing from alternative sources ("green" tariff values

What’s interesting on elcomUkraine 2016?

What’s interesting on elcomUkraine 2016?

22.04.2016

Now in Kiev held the 20th jubilee international exhibition elcomUkraine 2016 in conjunction with the exhibitions: "GREENEXPO | Alternative power generation in 2016"," EIA: Electronics and Industrial Automation"," TechnoDrive "and" Independent power engineering ".

Ukraine's Energy Sector. Results IKNET company 2015

Ukraine's Energy Sector. Results IKNET company 2015

05.04.2016

Developed 192 project. Implemented connection of the facilities with total capacity of 7015 kW to the electric power grids. Obtained the "green" tariff for biogas power plant

Ukraine's Energy Sector. Results 2015

Ukraine's Energy Sector. Results 2015

04.04.2016

On 16 th of July 2015 Law of Ukraine "On Amendments to Some Laws of Ukraine regarding the maintenance of competitive conditions of electricity generation from alternative energy sources" came into force http://w1.c1.rada.gov.ua/pls/zweb2/webproc4_1?pf3511=55219

Discussion of connection procedure to the electrical grids

Discussion of connection procedure to the electrical grids

01.04.2016

Specialists of IKNET participated in the NKREKP meeting a round table on the topic "Problems arising during the electrical connection (objects) customers to electrical networks, and possible legislative regulation." We hope to make appropriate changes to the current legislation of Ukraine on procedure joining electrical http://www.nerc.gov.ua/?news=5048

General contract

General contract

18.03.2016

IKNET Company functions as the General contractor at the stage of execution of design, construction and installation works, while providing the following services: Project works, na

Grid connection from 1 January 2013

Grid connection from 1 January 2013

19.07.2015

Changes in Ukrainian legislation concerning connection to power networks Starting from 01.01.2013 will be introduced changes concerning payment (fee) for connection of electricity facilities to power networks (the Law of Ukraine “On Amendments to Some Laws of Ukraine on payment for connection of natural monopolies to power networks” dated 22.06.2012 No. 5021-VI). The Law of Ukraine “On electricity” defines the following types of connection: standard connection – less than 160 kW; ...

Obtained another

Obtained another "green" tariff for electricity generated from biogas

19.07.2015

At the regular session of NERC on 22/08/2013, "TIS Eco" Company obtained the "green" tariff at a rate of 1.61 UAH / KW • h for electricity generated at the biogas power plant. This is the second biogas project in Ukraine which has received the right to sell all of scope of the electricity in the Wholesale Market by the "green" tariff, taking into account individual coefficient of 2.3. The first such project has been implemented by LNK Company in Boryspil district, Kyiv region. Since 2009 "TIS Eco" Company implements the project of construction of 200 kW power plant

The first

The first "green" tariffs for electricity generated at biogas power plants are in action in Ukraine

19.07.2015

Until quite recently, the conventional wisdom among many were that biogas as one of the "green" energy sectors of Ukraine cannot develop because the construction of biogas power plants requires a significant investment, and under the "green" tariffs, which are set for electricity from biogas such projects are simply unprofitable. Nevertheless, combined experience of the companies "LNK" and "EC NET" helps to eventually dispel these myths. In 2011, "LNK" company initiated projects of construction of the power plants fired by biogas from solid domestic waste (SDW) landfill

Solar energy activities in Ukraine. Barriers and prospects for further development

Solar energy activities in Ukraine. Barriers and prospects for further development

19.07.2015

Long-term experience of collaboration between EC NET Company and foreign investors shows that there are significant problems associated with implementation of alternative energy projects in Ukraine. Foremost it affects solar energy. Currently, there are several problems that significantly limit possibilities for further development of the solar energy. Being experts and practitioners in the field of conventional and alternative energy EC NET offers to review the main steps to be taken in order to help the Ukrainian market of renewable energy sources to solve problems at the leg

Show more