Wind power plant up to 1000 MW near the 750 kV substation "Kyivska" (Kyiv region)
30.06.2022
-
30.06.2022
-
30.06.2022
The essence of the project: construction of wind turbines, which will be located in Belotserkovsky district of Kyiv region Selection of the optimal connection option and capacity of wind turbines. Completed works of IKNET: developed TER "Connection of a new wind farm in the Belotserki district of the Kyiv region"; The TER is under approval by NEC &
30.06.2022
The essence of the project:to develop a scheme for issuing the power of wind turbines up to 150 MW, construction which is planned on the territory of the Vinnytsia region. Completed works of IKNET: the development of a feasibility study of the wind power generation scheme is indicative power up to 150 MW located on the territory of Vinnytsia region; The feas
30.06.2022
The essence of the project:preliminary determination of the possibility of connecting two wind power plants to the electrical grid of Ukraine 50-150 MW. Completed works of IKNET:a technical audit of the regions provided by the Customer was carried out in order to determine the possibility of connecting wind turbines to 330 kV substations with a minimum amount of their reconstruction.
29.06.2022
The essence of the project: to develop a scheme for issuing the power of wind turbines up to 150 MW, the construction of which is planned on the territory of the Odesa region. Completed works of IKNET: development of a feasibility study of the power generation scheme of wind power plants with an estimated capacity of up to 150 MW located in the Odesa region; The feasibili
29.06.2022
The essence of the project: joining the wind power plant, the construction of which is planned on the territory of the Dobroslav settlement community of the Odesa region. Completed works of IKNET: developed TER "Scheme of output of 100 MW wind turbine capacity on the territory of the Dobroslav settlement community in the Odesa district of the Odesa region"; The
08.03.2021
Project description: performing calculations of repair and repair and emergency modes of operation of electrical networks 110/150 and higher, when implementing the connection of a wind power plant with a capacity of 150 MW, the construction of which is planned in the Berdyansk district of the Zaporizhya region. Scope of
08.03.2021
Project description: construction of a 15 MW wind power plant near Yaremche, Ivano-Frankivsk region. Scope of IKNET: development of a preliminary feasibility study: assessment of the possibility of power supply to the network; the presence of environmental restrictions; preliminary installation of wind turbines on site and assessment of production.
08.03.2021
Project description: construction of two wind power plants with a capacity of up to 150 MW each with connection to the electric networks of the UES of Ukraine. Scope of IKNET: conducting a technical audit to determine the possibility of connecting to the electricity grids of the UES of Ukraine; analysis of 220-330 kV main substations in 17 regions of Ukraine.
08.03.2021
Project description: realization of the project of wind power plant of 300 MW in the Mykolaiv area. Scope of IKNET: conducting a technical audit (due diligence) of the project: assessment of wind potential; consideration of proposals for turbines and construction works; analysis of design solutions; environmental aspects;
08.03.2021
Project description: implementation of a 100 MW WPP project in the Odessa region. Scope of IKNET: Customer's technical consultant: ana
08.03.2021
Project description: construction of a wind power plant with a capacity of 21 MW, which is planned to be located in Chyhyryn district of Cherkasy region. Scope of IKNET: analysis of electrical networks in order to determine the most optimal connecti
08.03.2021
Project description: construction of a 72 MW wind power plant near the Dovgovolya village, Volodymyretsky district, Rivne region. Scope of IKNET: a feasibility study was developed for the power delivery scheme of a wind power plant with a projected capacity of 72 MW in order to analy
08.03.2021
Project description: construction of three wind power plants with a total capacity of up to 180 MW in the Zhytomyr region. Scope of IKNET: the feasibility study of the scheme of power supply of three wind power plants with a total capacity of up to 180
08.03.2021
Project description: construction of three wind power plants with a total capacity of up to 120 MW in the Zhytomyr region. Scope of IKNET: the feasibility study of the scheme of power supply of three wind farms with a total capacity of
18.12.2019
Essence of the Project: Construction of a 25 MW wind power plant within Parutynska and Ostrivska village councils of Ochakivsky district, Mykolaiv regiont. Works executed by IKNET: The feasibility study "The scheme of power output of a 25 MW wind powe
18.12.2019
Essence of the Project: construction of a wind power plant with a capacity of 150 MW in the area of Kramatorsk, Donetsk region. Works executed by IKNET: The feasibility study of power increase and the scheme of connection of Kramatorsk wind power station with 66 MW to 150 MW located in t
18.12.2019
Essence of the Project: construction of wind and solar power plants with capacity of 25.2 and 50.4 MW in Ivano-Frankivsk region. Works executed by IKNET: The feasibility study "The scheme of power output of a solar power plant with
18.12.2019
Essence of the Project: construction of a wind power plant with capacity up to 300 MW in the Kyiv region. Works executed by IKNET: The feasibility study "The scheme of power output of a wind power plant with the capacity up to 300 MW near the displaced village of Leliv, Ivankiv
18.12.2019
Essence of the Project: construction of a 40.5 MW wind power plant in the Kyiv region. Works executed by IKNET: The feasibility study "The scheme of power output of 40.5 MW wind power plant near the displaced village of Leliv, Ivankiv district of the Kyiv region" was developed; The feasibility study
17.12.2019
Essence of the Project: construction of a wind power plant with a capacity of 22.4 MW in Odesa region. Works executed by IKNET: The feasibility study "The scheme of power output of the Baltsk WPP with the capacity of 22.4 MW within the limits o
16.12.2019
Essence of the Project: construction of a 63 MW wind power plant nearby village Trudove of the Bilmatsk district of Zaporizhzhya region. Works executed by IKNET: The feasibility study "The scheme of capacity output of a 63 MW wind power plant near the village Trudove of the Bilmatsk dist
16.12.2019
Essence of the Project: construction of a 300 MW wind power plant in Ochakiv district of Mykolaiv region. Works executed by IKNET: The feasibility study "The scheme of output of 300 MW capacity of a wind power plant in Ochakiv district of Mykolaiv region" was developed. Accord
16.12.2019
Essence of the Project: carrying out a technical audit of documentation for the construction of a wind power plant of 76.5 MW near town Yuzhne, Odesa region. Works executed by IKNET: audit of existing documents, which are necessary for determining the cost of producing electric power of a wind power plant 76.5 MW.
16.12.2019
Essence of the Project: technical audit of documentation for the construction of a 250 MW wind power plant in Chaplinsky district of the Kherson region. Works executed by IKNET: Audit of existing documents that are necessary to determine the cost of wind power generation electric power
05.11.2019
Essence of the Project: carrying out a technical audit of documentation for the construction of a wind power plant of 57600 kW, the construction of which is planned on the territory of the Roksolanivka village council of Ovidiopol district of the Odesa region.