Traditional energy

Scheme for the long-term development of the distribution system until 2032

Scheme for the long-term development of the distribution system until 2032

13.05.2024

Project description: implementation of the scheme for the long-term development of 20 (35) kV and above for the period from 2023 to 2032 at DTEK DNEPR ELECTRONIC NETWORKS JSC. Works performed by IKNET:     forecasting the levels of electricity consumption and load for winter and summer for the period 2022-2032;     actual and prospective volumes of electricity generated by generating facilities were determined;     analysis of the existing state of substations, th

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

The scheme of perspective development of distribution system till 2029

The scheme of perspective development of distribution system till 2029

29.06.2022

-

Construction of a new 220 kV substation with 160 MVA transformers

Construction of a new 220 kV substation with 160 MVA transformers

29.06.2022

-

75 MW steel shop

75 MW steel shop

29.06.2022

-

Thermal power plant with a capacity of 6 MW (Kyiv region)

Thermal power plant with a capacity of 6 MW (Kyiv region)

28.06.2022

-

Scheme of perspective development of the distribution system until 2031

Scheme of perspective development of the distribution system until 2031

28.06.2022

-

Traction substation 150/35/10 kV

Traction substation 150/35/10 kV "Yakymivka" (Zaporizhzhya region)

08.03.2021

Project description: technical re-equipment of the 150/35/10 kV traction substation "Yakymivka" in the part of 10 kV closed switchgear for power supply of two solar power plants with a capacity of 4900 kW each, which are located on the territory of Yakymivka village council of Yakymivka district of Zaporizhia region outside the settlement.  

Scheme of perspective development of the distribution system until 2030

Scheme of perspective development of the distribution system until 2030

08.03.2021

Project description: implementation of the scheme of perspective development of the distribution system of 20 (35) kV and higher for the period from 2021 to 2030 of JSC DTEK Dniprovsky Elektromerezhi.   Scope of IKNET: forecast of levels of electricity consumption and load for winter and summer for the period 2021-2030; actual and prospective volumes of electricity generat

Electricity market analysis

Electricity market analysis

03.02.2021

Project description: consideration and analysis of legislative aspects in the field of electricity of Ukraine. Scope of IKNET: analysis of the solar energy sector, in particular the conditions for the sale of electrical energy from SPP for own consumption; analysis of the structure of electricity consumption and the largest consumers of electricity in Ukraine; consideration o

Residential complex 2260 kW of Kyiv region

Residential complex 2260 kW of Kyiv region

11.10.2019

Essence of the Project: construction of a residential complex on the territory of the Sofievsky-Borschagivsky village council of Kyiv-Svyatoshinsky district of the Kyiv region. The maximum assumed load is 2260 kW. Works executed by IKNET: development and approval of working projects of the 1st and 2nd stage of the scheme of external power supply of res

Residential complex 4900 kW of Kyiv-Svyatoshinsky district of the Kyiv region

Residential complex 4900 kW of Kyiv-Svyatoshinsky district of the Kyiv region

10.10.2019

Essence of the Project: construction of a residential complex on the territory of the Sofievsky-Borschagivsky village council of Kyiv-Svyatoshinsky district of the Kyiv region. The maximum assumed load is 4900 kW. Works executed by IKNET: development and approval of the electricity supply project of the building machinery of the residential comp

Motorcycle plant Kyiv region

Motorcycle plant Kyiv region

10.10.2019

Essence of the Project: Reconstruction of the internal electric networks of the Kyiv motorcycle plant. Works executed by IKNET: Development and approval of the project "Reconstruction of electric networks 10 kV and 0.4 kV".

External power supply of the industrial park (Kyiv region)

External power supply of the industrial park (Kyiv region)

22.12.2017

Essence of the Project: external power supply of industrial premises of the industrial park in the Kyiv region. Works executed by IK NET: elaboration and ag

Connection of facilities of butter factory with capacity 2400 kW to the electric networks (Kyiv region)

Connection of facilities of butter factory with capacity 2400 kW to the electric networks (Kyiv region)

22.12.2017

Essence of the Project: connection of facilities of butter factory to the electric networks in Kyiv region. Works

Obtaining of a license for electricity supply (Lviv city)

Obtaining of a license for electricity supply (Lviv city)

21.12.2017

Essence of the Project: organization of work of the company for electric energy supply in Lviv. Works executed by IK

Shopping and entertainment center (Kyiv-Svyatoshinsky district, Kyiv Region)

Shopping and entertainment center (Kyiv-Svyatoshinsky district, Kyiv Region)

04.08.2016

Essence of the Project: shopping and entertainment center construction (SEC) in Kyiv Region. Maximum estimated load is 2000 kW. Works executed by IKNET:

Manufacturing enterprise (Boryspil, Kyiv region)

Manufacturing enterprise (Boryspil, Kyiv region)

03.08.2016

Essence of the Project: connection additional load of manufacturing enterprise to the electric networks in Boryspil, Kyiv region. The maximum calculated load is 5,9 MW.

Residential building capacity of 811 kW (Boryspil, Kyiv region)

Residential building capacity of 811 kW (Boryspil, Kyiv region)

03.08.2016

Essence of the Project: construction  of residential building in Boryspil, Kyiv region. The maximum calculated load is 811 kW (ІІ category of power supply reliability). ...

Serving cooperative society in Kyiv region

Serving cooperative society in Kyiv region

03.08.2016

Essence of the Project: construction of buildings and serving cooperative society on the Malyutyanskoyi territory village council of Kyivo-Sviatoshynsky district, Kyiv region.  The maximum calculated load is 202 kW.

"PARK TOWN" Shopping center (Borispil City, Kyiv Region)

05.04.2016

Essence of the Project: construction of "PARK TOWN" Shopping center. Capacity of the "PARK TOWN" Shopping center makes 830 kW. Works executed by IKNET: TR was obtained at PJSC "Kyiveoblnergo"; development and approval of the Detailed Design of external supply sheme in PJSC "Kyiveoblnergo".

Shopping center (Kyiv City)

Shopping center (Kyiv City)

28.03.2016

Essence of the Project: construction Shopping center. Capacity of the Shopping cente makes 15 MW. Works executed by IKNET: development of the FS "Scheme of external power supply of shopping and entertainment center"; obtaining of the corresponding approvals of FS in DTGO "Pivdenno-zahidna zaliznitsya" and Central Power System NPC "Ukrenergo".

"CRAZY BBQ" Restaurant (Prolisky Village, Kyiv Region)

20.08.2015

Essence of the Project: construction of "CRAZY BBQ" Restaurant. Capacity of the "CRAZY BBQ" Restaurant makes 200 kW. Works executed by IKNET: TR was obtained at PJSC "Kyiveoblnergo"; development and approval of the Detailed Design of external supply in PJSC "Kyiveoblnergo".

IT-park with capacity 7,5 MW (Lviv city)

IT-park with capacity 7,5 MW (Lviv city)

20.08.2015

Essence of the Project: construction of building complex with research-and-production and industrial purpose objects, social infrastructure objects and parkings. Works executed by IKNET: audit of possible object connection to the power grids variants.

Serving cooperative society (Vishgorodsky District, Kyiv Region)

Serving cooperative society (Vishgorodsky District, Kyiv Region)

20.08.2015

Essence of the Project: construction of buildings and constructions for gardening conducting on territories of Sinyakivsky rural advice, Vishgorodsky District, Kyiv Region. Works executed by IKNET: TR was obtained at PJSC "Kyiveoblnergo"; Development and approval of the Detailed Design of external supply circiut for 35 garden sites in PJSC "Kyiveoblnergo".

Restaurant complex in Goloseevskiy park (Kyiv city)

Restaurant complex in Goloseevskiy park (Kyiv city)

20.08.2015

Essence of the Project: construction of the restaurant complex. Capacity of the restaurant makes 170 kW. Works executed by IKNET: TR was obtained at PJSC "Kyivenergo"; Development and approval of the Detailed Design of external supply circiut in PJSC "Kyivenergo".

Cogeneration plant for combined production of electric and thermal energy from mine gas with a capacity of 3.2 MW (Sukhodolsk, Lugansk region).

Cogeneration plant for combined production of electric and thermal energy from mine gas with a capacity of 3.2 MW (Sukhodolsk, Lugansk region).

09.08.2015

Construction of a cogeneration unit (СHP) for combined production of electric and thermal energy from mine gas at the mine site. The installed capacity of the CHP is 3.2 MW. Works executed by IKNET: the audit of the project for the purpose of analyzing the adequacy and the content of the permit documentation required for connection of CHP to an external power grid and putting it into operation; three variants of the project implementation were developed and a list of all necessary measures for each of the options was provided....

Industrial park (Big Dymerka settlement, Kiev region)

Industrial park (Big Dymerka settlement, Kiev region)

24.07.2015

The construction of an industrial park on the land near the settlement Bolshaya Dymerka, Kievskaya obl. The area of ​​the land plot is 105.0 hectares. Works executed by IKNET: an audit of engineering communications of  the land plot was carried out. Within the framework of the audit, the following engineering communications were analyzed: existing electric networks and development of possible options for connecting an industrial park to external grids;  possible options for heat supply; ...

Sports and entertainment complex with a capacity of 10 MW (Kiev)

Sports and entertainment complex with a capacity of 10 MW (Kiev)

24.07.2015

The construction of a multifunctional sports and entertainment complex with a parking and a hotel. The capacity of the complex is 10 MW. Works executed by IKNET: The feasibility study "Scheme of external power supply of the Complex in Kiev" was developed; received Technical Requirements in PJSC "Kyivenergo"; agreed Technical Requirements in the Central Power System of NEC "Ukrenergo".

Maintenance unit (Kharkiv city)

Maintenance unit (Kharkiv city)

24.07.2015

Essence of the Project: reconstruction of the power supply chart of "Kharkiv" maintenance unit. Works executed by IK NET: Development of the Detailed Design of reconstruction of the power supply node of "Kharkiv" maintenance unit according to the obtained TR in SE "Southern Railway"; Obtaining of the Detailed Design approvals at SE "Southern Railway".

Gas compressor station (Boyarka, Kiev region)

Gas compressor station (Boyarka, Kiev region)

24.07.2015

The project foresees the reconstruction of the external power supply system for a gas compressor station with increaseing capacity by 5 MW. Completed work of IKNET in this project: • a Feasibility Study for the reconstruction of the external power supply system for the Boyarka compressor station; • FS have been agreed with the Central Power System of NEC Ukrenergo and PJSC "Kyivoblenergo"; • The Technical Requirements have been obtained in PJSC "Kyivoblenergo"; • The Technical Requi

Logistic Park with capacity of 8 MW (Kievo-Svyatoshinskiy District, Kyiv Region)

Logistic Park with capacity of 8 MW (Kievo-Svyatoshinskiy District, Kyiv Region)

24.07.2015

Construction of the logistic park is forseen near main motorway of Kievo-Svyatoshinskiy District, Kyiv Region. Capacity of the logistic park makes 8 MW. Works executed by IK NET in the frame of this project: development of the FS "External power supply circuit of the Logistik Park near main motorway of Kievo-Svyatoshinskiy District, Kyiv Region; approvals of FS in Central Power System of NPC "Ukrenergo" and PJSC "AES Kyivoblenergo".

Agroindustrial complex for storage and processing of agricultural production (Dymerka village, Brovary District, Kyiv Region)

Agroindustrial complex for storage and processing of agricultural production (Dymerka village, Brovary District, Kyiv Region)

24.07.2015

Agroindustrial complex for storage and processing of agricultural production constructed at Dymerka village, Brovary district, Kyiv region. Maximal estimated loading is 2 200 kW of I and ІІ categories. Works executed by IKNET in the frame of this project: Development and approval of the Detailed Design of external supply circiut in PJSC "AES Kyivoblenergo"; Construction of 35/10 kV SS with two 35/10 kV power transformers with capacity of 2×4,0 MVA; Reconstruction of 110/35/10 kV SS “Coca-Cola” with ...

Show more