Top 10 nuclear power plants in Europe (2025)
08.09.2025
Europe's Nuclear Power Plants: Top 10 by Capacity (August 2025)
08.09.2025
Europe's Nuclear Power Plants: Top 10 by Capacity (August 2025)
13.05.2024
Project description: implementation of the scheme for the long-term development of 20 (35) kV and above for the period from 2023 to 2032 at DTEK DNEPR ELECTRONIC NETWORKS JSC. Works performed by IKNET: forecasting the levels of electricity consumption and load for winter and summer for the period 2022-2032; actual and prospective volumes of electricity generated by generating facilities were determined; analysis of the existing state of substations, th
29.06.2022
-
29.06.2022
-
29.06.2022
-
29.06.2022
-
29.06.2022
-
28.06.2022
-
28.06.2022
-
08.03.2021
Project description: technical re-equipment of the 150/35/10 kV traction substation "Yakymivka" in the part of 10 kV closed switchgear for power supply of two solar power plants with a capacity of 4900 kW each, which are located on the territory of Yakymivka village council of Yakymivka district of Zaporizhia region outside the settlement.
08.03.2021
Project description: implementation of the scheme of perspective development of the distribution system of 20 (35) kV and higher for the period from 2021 to 2030 of JSC DTEK Dniprovsky Elektromerezhi. Scope of IKNET: forecast of levels of electricity consumption and load for winter and summer for the period 2021-2030; actual and prospective volumes of electricity generat
03.02.2021
Project description: consideration and analysis of legislative aspects in the field of electricity of Ukraine. Scope of IKNET: analysis of the solar energy sector, in particular the conditions for the sale of electrical energy from SPP for own consumption; analysis of the structure of electricity consumption and the largest consumers of electricity in Ukraine; consideration o
11.10.2019
Essence of the Project: construction of a residential complex on the territory of the Sofievsky-Borschagivsky village council of Kyiv-Svyatoshinsky district of the Kyiv region. The maximum assumed load is 2260 kW. Works executed by IKNET: development and approval of working projects of the 1st and 2nd stage of the scheme of external power supply of res
10.10.2019
Essence of the Project: construction of a residential complex on the territory of the Sofievsky-Borschagivsky village council of Kyiv-Svyatoshinsky district of the Kyiv region. The maximum assumed load is 4900 kW. Works executed by IKNET: development and approval of the electricity supply project of the building machinery of the residential comp
10.10.2019
Essence of the Project: Reconstruction of the internal electric networks of the Kyiv motorcycle plant. Works executed by IKNET: Development and approval of the project "Reconstruction of electric networks 10 kV and 0.4 kV".
22.12.2017
Essence of the Project: external power supply of industrial premises of the industrial park in the Kyiv region. Works executed by IK NET: elaboration and ag
22.12.2017
Essence of the Project: connection of facilities of butter factory to the electric networks in Kyiv region. Works
21.12.2017
Essence of the Project: organization of work of the company for electric energy supply in Lviv. Works executed by IK
04.08.2016
Essence of the Project: shopping and entertainment center construction (SEC) in Kyiv Region. Maximum estimated load is 2000 kW. Works executed by IKNET:
03.08.2016
Essence of the Project: connection additional load of manufacturing enterprise to the electric networks in Boryspil, Kyiv region. The maximum calculated load is 5,9 MW.
03.08.2016
Essence of the Project: construction of residential building in Boryspil, Kyiv region. The maximum calculated load is 811 kW (ІІ category of power supply reliability). ...
03.08.2016
Essence of the Project: construction of buildings and serving cooperative society on the Malyutyanskoyi territory village council of Kyivo-Sviatoshynsky district, Kyiv region. The maximum calculated load is 202 kW.
05.04.2016
Essence of the Project: construction of "PARK TOWN" Shopping center. Capacity of the "PARK TOWN" Shopping center makes 830 kW. Works executed by IKNET: TR was obtained at PJSC "Kyiveoblnergo"; development and approval of the Detailed Design of external supply sheme in PJSC "Kyiveoblnergo".
28.03.2016
Essence of the Project: construction Shopping center. Capacity of the Shopping cente makes 15 MW. Works executed by IKNET: development of the FS "Scheme of external power supply of shopping and entertainment center"; obtaining of the corresponding approvals of FS in DTGO "Pivdenno-zahidna zaliznitsya" and Central Power System NPC "Ukrenergo".
20.08.2015
Essence of the Project: construction of "CRAZY BBQ" Restaurant. Capacity of the "CRAZY BBQ" Restaurant makes 200 kW. Works executed by IKNET: TR was obtained at PJSC "Kyiveoblnergo"; development and approval of the Detailed Design of external supply in PJSC "Kyiveoblnergo".
20.08.2015
Essence of the Project: construction of building complex with research-and-production and industrial purpose objects, social infrastructure objects and parkings. Works executed by IKNET: audit of possible object connection to the power grids variants.
20.08.2015
Essence of the Project: construction of buildings and constructions for gardening conducting on territories of Sinyakivsky rural advice, Vishgorodsky District, Kyiv Region. Works executed by IKNET: TR was obtained at PJSC "Kyiveoblnergo"; Development and approval of the Detailed Design of external supply circiut for 35 garden sites in PJSC "Kyiveoblnergo".
20.08.2015
Essence of the Project: construction of the restaurant complex. Capacity of the restaurant makes 170 kW. Works executed by IKNET: TR was obtained at PJSC "Kyivenergo"; Development and approval of the Detailed Design of external supply circiut in PJSC "Kyivenergo".
09.08.2015
Construction of a cogeneration unit (СHP) for combined production of electric and thermal energy from mine gas at the mine site. The installed capacity of the CHP is 3.2 MW. Works executed by IKNET: the audit of the project for the purpose of analyzing the adequacy and the content of the permit documentation required for connection of CHP to an external power grid and putting it into operation; three variants of the project implementation were developed and a list of all necessary measures for each of the options was provided....
24.07.2015
The construction of an industrial park on the land near the settlement Bolshaya Dymerka, Kievskaya obl. The area of the land plot is 105.0 hectares. Works executed by IKNET: an audit of engineering communications of the land plot was carried out. Within the framework of the audit, the following engineering communications were analyzed: existing electric networks and development of possible options for connecting an industrial park to external grids; possible options for heat supply; ...
24.07.2015
The construction of a multifunctional sports and entertainment complex with a parking and a hotel. The capacity of the complex is 10 MW. Works executed by IKNET: The feasibility study "Scheme of external power supply of the Complex in Kiev" was developed; received Technical Requirements in PJSC "Kyivenergo"; agreed Technical Requirements in the Central Power System of NEC "Ukrenergo".
24.07.2015
Essence of the Project: reconstruction of the power supply chart of "Kharkiv" maintenance unit. Works executed by IK NET: Development of the Detailed Design of reconstruction of the power supply node of "Kharkiv" maintenance unit according to the obtained TR in SE "Southern Railway"; Obtaining of the Detailed Design approvals at SE "Southern Railway".
24.07.2015
The project foresees the reconstruction of the external power supply system for a gas compressor station with increaseing capacity by 5 MW. Completed work of IKNET in this project: • a Feasibility Study for the reconstruction of the external power supply system for the Boyarka compressor station; • FS have been agreed with the Central Power System of NEC Ukrenergo and PJSC "Kyivoblenergo"; • The Technical Requirements have been obtained in PJSC "Kyivoblenergo"; • The Technical Requi
24.07.2015
Construction of the logistic park is forseen near main motorway of Kievo-Svyatoshinskiy District, Kyiv Region. Capacity of the logistic park makes 8 MW. Works executed by IK NET in the frame of this project: development of the FS "External power supply circuit of the Logistik Park near main motorway of Kievo-Svyatoshinskiy District, Kyiv Region; approvals of FS in Central Power System of NPC "Ukrenergo" and PJSC "AES Kyivoblenergo".
24.07.2015
Agroindustrial complex for storage and processing of agricultural production constructed at Dymerka village, Brovary district, Kyiv region. Maximal estimated loading is 2 200 kW of I and ІІ categories. Works executed by IKNET in the frame of this project: Development and approval of the Detailed Design of external supply circiut in PJSC "AES Kyivoblenergo"; Construction of 35/10 kV SS with two 35/10 kV power transformers with capacity of 2×4,0 MVA; Reconstruction of 110/35/10 kV SS “Coca-Cola” with ...