Cogeneration unit 12.1 MW
29.06.2022
-
29.06.2022
-
03.02.2021
Project description: connection to external power grids of a turbine generator with a condensing turbine with a capacity of 23.751 MW. Scope of IKNET: development and approval of a working design for the new construction of 35 kV cable
03.02.2021
Project description: completion of the working project for the reconstruction and completion of the energy complex of the industrial CHP by installing a higher capacity turbine unit in Kropyvnytskyi. Scope of IKNET: development of the p
11.10.2019
Essence of the Project: construction of a biomass power plant with 12 MW capacity in Kagarlyk town, Kyiv region. Works executed by IKNET: • preliminary conclusions regarding the choice of the final installed power of the biomass power plant and the normative variant of its power distribution scheme in
14.08.2019
Essence of the Project: implementation of the Automated Electricity Commercial Accounting System (AECAS) for a 1.5 MW cogeneration plant in a biogas plant in Volnovakha, Donetsk region.
02.07.2019
Essence of the Project: Construction of a 5 MW biomass power plant in Pereyaslav-Khmelnitsky, Kyiv region.
21.12.2017
Essence of the Project: construction of biomass power plant with installed capacity 9 MW in Kyiv region. Works executed by IK NET: determination of the optimal possibility of parallel operation of the biomass power plant with United Energy System of Ukraine, including the required amount of electricity grid construction and estimated costs.
21.12.2017
Essence of the Project: construction of CHP on peanut sunflower with capacity 7 МW in Odessa region. Works executed by IK NET: choosing of the optimal possibility of parallel operation of the CHP on peanut sunflower with United Power System of Ukraine, including the required amount of electricity grid construction and estimated costs.
21.12.2017
Essence of the Project: construction of the biogas power plant with capacity 1.3 MW in Cherkasy city. Works executed by IKNET: determination of the optimal possibility of parallel operation of the biogas power plant with United Power System of Ukraine, including the required amount of electricity grid construction and estimated costs.
03.08.2016
Essence of the Project: biomass power plant construction on waste wood near the railway station Romankivtsi, Sokyryany district of Chernivtsi region. Works executed by IKNET:
20.08.2015
Essence of the Project: construction of Biomass Power Plant. Electric capacity of Power Plant is 2 MW. It is planning to use waste from wood processing as a fuel. Works executed by IK NET: audit of possible capacity output chart variants; development of the Business Model of the project.
20.08.2015
Essence of the Project: construction of engineering complex with installed system of biogas collection. Electric capacity of the generating unit is 1 MW. Works executed by EC NET: project supervision concerning construction of the facility; its commissioning and putting into operation; preparation and processing of all necessary documents in order to obtain license at the NKREKP; consulting support of obtaining of Membership in SE "Energorynok"; preparation and registration of documents necessary ...
27.07.2015
Construction of biomass power plant in Borodyanka, Kyiv region. The power plant's capacity is 12.5 MW. The use of wood waste is assumed as a biomass. Works executed by IKNET: a business model of the project "Construction of a biomass power plant with an estimated total electric capacity of 12,500 kW located in the Borodyansky district of the Kiev region" was developed. In the framework of this business model the following was fulfilled: the conditions for the implementation of this project have b
27.07.2015
Construction of a cogeneration unit (CHP) on milling peat and waste wood in Yagotin, Kyiv region. The capacity of the CHP is 2.5 MW. Performed works of IKNET: The business model of the project for the construction of a cogeneration plant on milling peat and wood waste has been developed. Within the framework of the developed business model, the following is performed: the conditions for the implementation of the project have been determined in accordance with the current legislation of Ukraine regarding
27.07.2015
Construction of complex engineering facility with the system of biogas collection at the solid domestic wastes (SDW) landfill No. 5 in Obukhiv district of Kyiv region. Electric capacity of the generating unit is 885 kW. In this project our company executed the following activities: Project supervision concerning construction of the facility; its commissioning and putting into operation; Estimation of the tariff on production of electricity by generating unit; Preparation and processing of all necessary documents in order to ...