BioPP

Cogeneration unit 12.1 MW

Cogeneration unit 12.1 MW

29.06.2022

-

Cogeneration unit 13.16 MW (Kirovograd region)

Cogeneration unit 13.16 MW (Kirovograd region)

03.02.2021

Project description: completion of the working project for the reconstruction and completion of the energy complex of the industrial CHP by installing a higher capacity turbine unit in Kropyvnytskyi. Scope of IKNET: development of the p

Biomass power plant with 12 MW capacity (Kyiv region)

Biomass power plant with 12 MW capacity (Kyiv region)

11.10.2019

Essence of the Project: construction of a biomass power plant with 12 MW capacity in Kagarlyk town, Kyiv region. Works executed by IKNET: •    preliminary conclusions regarding the choice of the final installed power of the biomass power plant and the normative variant of its power distribution scheme in

Biomass Power Plant 5 MW (Pereyaslav-Khmelnytsky, Kyiv Oblast)

Biomass Power Plant 5 MW (Pereyaslav-Khmelnytsky, Kyiv Oblast)

02.07.2019

Essence of the Project: Construction of a 5 MW biomass power plant in Pereyaslav-Khmelnitsky, Kyiv region.

Biomass power plant (Sokyryany district, Chernivtsi region)

Biomass power plant (Sokyryany district, Chernivtsi region)

03.08.2016

Essence of the Project: biomass power plant construction on waste wood near the railway station Romankivtsi, Sokyryany district of Chernivtsi region. Works executed by IKNET:

Biomass Power Plant with capacity of 2 MW (Novosilki Village, Kyiv Region)

Biomass Power Plant with capacity of 2 MW (Novosilki Village, Kyiv Region)

20.08.2015

Essence of the Project: construction of Biomass Power Plant. Electric capacity of Power Plant is 2 MW. It is planning to use waste from wood processing as a fuel. Works executed by IK NET: audit of possible capacity output chart variants; development of the Business Model of the project.

Power plant on biomass with a capacity of 12.5 MW (Borodyanka, Kyiv region)

Power plant on biomass with a capacity of 12.5 MW (Borodyanka, Kyiv region)

27.07.2015

Construction of biomass power plant in Borodyanka, Kyiv region. The power plant's capacity is 12.5 MW. The use of wood waste is assumed as a biomass. Works executed by IKNET: a business model of the project "Construction of a biomass power plant with an estimated total electric capacity of 12,500 kW located in the Borodyansky district of the Kiev region" was developed. In the framework of this business model the following was fulfilled:   the conditions for the implementation of this project have b

Cogeneration plant 2,5 MW on milling peat (Yagotin, Kyiv region)

Cogeneration plant 2,5 MW on milling peat (Yagotin, Kyiv region)

27.07.2015

  Construction of a cogeneration unit (CHP) on milling peat and waste wood in Yagotin, Kyiv region. The capacity of the CHP is 2.5 MW. Performed works of IKNET: The business model of the project for the construction of a cogeneration plant on milling peat and wood waste has been developed. Within the framework of the developed business model, the following is performed: the conditions for the implementation of the project have been determined in accordance with the current legislation of Ukraine regarding

Show more