Cogeneration unit 12.1 MW
29.06.2022
-
29.06.2022
-
03.02.2021
Project description: connection to external power grids of a turbine generator with a condensing turbine with a capacity of 23.751 MW. Scope of IKNET: development and approval of a working design for the new construction of 35 kV cable
03.02.2021
Project description: completion of the working project for the reconstruction and completion of the energy complex of the industrial CHP by installing a higher capacity turbine unit in Kropyvnytskyi. Scope of IKNET: development of the p
11.10.2019
Essence of the Project: construction of a biomass power plant with 12 MW capacity in Kagarlyk town, Kyiv region. Works executed by IKNET: • preliminary conclusions regarding the choice of the final installed power of the biomass power plant and the normative variant of its power distribution scheme in
14.08.2019
Essence of the Project: implementation of the Automated Electricity Commercial Accounting System (AECAS) for a 1.5 MW cogeneration plant in a biogas plant in Volnovakha, Donetsk region.
02.07.2019
Essence of the Project: Construction of a 5 MW biomass power plant in Pereyaslav-Khmelnitsky, Kyiv region.
21.12.2017
Essence of the Project: construction of biomass power plant with installed capacity 9 MW in Kyiv region. Works executed by IK NET: determination of the optimal possibility of parallel operation of the biomass power plant with United Energy System of Ukraine, including the required amount of electricity grid construction and estimated costs.
21.12.2017
Essence of the Project: construction of CHP on peanut sunflower with capacity 7 МW in Odessa region. Works executed by IK NET: choosing of the optimal possibility of parallel operation of the CHP on peanut sunflower with United Power System of Ukraine, including the required amount of electricity grid construction and estimated costs.
21.12.2017
Essence of the Project: construction of the biogas power plant with capacity 1.3 MW in Cherkasy city. Works executed by IKNET: determination of the optimal possibility of parallel operation of the biogas power plant with United Power System of Ukraine, including the required amount of electricity grid construction and estimated costs.
03.08.2016
Essence of the Project: biomass power plant construction on waste wood near the railway station Romankivtsi, Sokyryany district of Chernivtsi region. Works executed by IKNET: