Traditional energy

Scheme for the long-term development of the distribution system until 2032

Scheme for the long-term development of the distribution system until 2032

13.05.2024

Project description: implementation of the scheme for the long-term development of 20 (35) kV and above for the period from 2023 to 2032 at DTEK DNEPR ELECTRONIC NETWORKS JSC. Works performed by IKNET:     forecasting the levels of electricity consumption and load for winter and summer for the period 2022-2032;     actual and prospective volumes of electricity generated by generating facilities were determined;     analysis of the existing state of substations, th

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

The scheme of perspective development of distribution system till 2029

The scheme of perspective development of distribution system till 2029

29.06.2022

-

Construction of a new 220 kV substation with 160 MVA transformers

Construction of a new 220 kV substation with 160 MVA transformers

29.06.2022

-

75 MW steel shop

75 MW steel shop

29.06.2022

-

Thermal power plant with a capacity of 6 MW (Kyiv region)

Thermal power plant with a capacity of 6 MW (Kyiv region)

28.06.2022

-

Scheme of perspective development of the distribution system until 2031

Scheme of perspective development of the distribution system until 2031

28.06.2022

-

Traction substation 150/35/10 kV

Traction substation 150/35/10 kV "Yakymivka" (Zaporizhzhya region)

08.03.2021

Project description: technical re-equipment of the 150/35/10 kV traction substation "Yakymivka" in the part of 10 kV closed switchgear for power supply of two solar power plants with a capacity of 4900 kW each, which are located on the territory of Yakymivka village council of Yakymivka district of Zaporizhia region outside the settlement.  

Scheme of perspective development of the distribution system until 2030

Scheme of perspective development of the distribution system until 2030

08.03.2021

Project description: implementation of the scheme of perspective development of the distribution system of 20 (35) kV and higher for the period from 2021 to 2030 of JSC DTEK Dniprovsky Elektromerezhi.   Scope of IKNET: forecast of levels of electricity consumption and load for winter and summer for the period 2021-2030; actual and prospective volumes of electricity generat

Electricity market analysis

Electricity market analysis

03.02.2021

Project description: consideration and analysis of legislative aspects in the field of electricity of Ukraine. Scope of IKNET: analysis of the solar energy sector, in particular the conditions for the sale of electrical energy from SPP for own consumption; analysis of the structure of electricity consumption and the largest consumers of electricity in Ukraine; consideration o

Residential complex 2260 kW of Kyiv region

Residential complex 2260 kW of Kyiv region

11.10.2019

Essence of the Project: construction of a residential complex on the territory of the Sofievsky-Borschagivsky village council of Kyiv-Svyatoshinsky district of the Kyiv region. The maximum assumed load is 2260 kW. Works executed by IKNET: development and approval of working projects of the 1st and 2nd stage of the scheme of external power supply of res

Residential complex 4900 kW of Kyiv-Svyatoshinsky district of the Kyiv region

Residential complex 4900 kW of Kyiv-Svyatoshinsky district of the Kyiv region

10.10.2019

Essence of the Project: construction of a residential complex on the territory of the Sofievsky-Borschagivsky village council of Kyiv-Svyatoshinsky district of the Kyiv region. The maximum assumed load is 4900 kW. Works executed by IKNET: development and approval of the electricity supply project of the building machinery of the residential comp

Motorcycle plant Kyiv region

Motorcycle plant Kyiv region

10.10.2019

Essence of the Project: Reconstruction of the internal electric networks of the Kyiv motorcycle plant. Works executed by IKNET: Development and approval of the project "Reconstruction of electric networks 10 kV and 0.4 kV".

External power supply of the industrial park (Kyiv region)

External power supply of the industrial park (Kyiv region)

22.12.2017

Essence of the Project: external power supply of industrial premises of the industrial park in the Kyiv region. Works executed by IK NET: elaboration and ag

Connection of facilities of butter factory with capacity 2400 kW to the electric networks (Kyiv region)

Connection of facilities of butter factory with capacity 2400 kW to the electric networks (Kyiv region)

22.12.2017

Essence of the Project: connection of facilities of butter factory to the electric networks in Kyiv region. Works

Obtaining of a license for electricity supply (Lviv city)

Obtaining of a license for electricity supply (Lviv city)

21.12.2017

Essence of the Project: organization of work of the company for electric energy supply in Lviv. Works executed by IK

Shopping and entertainment center (Kyiv-Svyatoshinsky district, Kyiv Region)

Shopping and entertainment center (Kyiv-Svyatoshinsky district, Kyiv Region)

04.08.2016

Essence of the Project: shopping and entertainment center construction (SEC) in Kyiv Region. Maximum estimated load is 2000 kW. Works executed by IKNET:

Manufacturing enterprise (Boryspil, Kyiv region)

Manufacturing enterprise (Boryspil, Kyiv region)

03.08.2016

Essence of the Project: connection additional load of manufacturing enterprise to the electric networks in Boryspil, Kyiv region. The maximum calculated load is 5,9 MW.

Residential building capacity of 811 kW (Boryspil, Kyiv region)

Residential building capacity of 811 kW (Boryspil, Kyiv region)

03.08.2016

Essence of the Project: construction  of residential building in Boryspil, Kyiv region. The maximum calculated load is 811 kW (ІІ category of power supply reliability). ...

Serving cooperative society in Kyiv region

Serving cooperative society in Kyiv region

03.08.2016

Essence of the Project: construction of buildings and serving cooperative society on the Malyutyanskoyi territory village council of Kyivo-Sviatoshynsky district, Kyiv region.  The maximum calculated load is 202 kW.

"PARK TOWN" Shopping center (Borispil City, Kyiv Region)

05.04.2016

Essence of the Project: construction of "PARK TOWN" Shopping center. Capacity of the "PARK TOWN" Shopping center makes 830 kW. Works executed by IKNET: TR was obtained at PJSC "Kyiveoblnergo"; development and approval of the Detailed Design of external supply sheme in PJSC "Kyiveoblnergo".

Shopping center (Kyiv City)

Shopping center (Kyiv City)

28.03.2016

Essence of the Project: construction Shopping center. Capacity of the Shopping cente makes 15 MW. Works executed by IKNET: development of the FS "Scheme of external power supply of shopping and entertainment center"; obtaining of the corresponding approvals of FS in DTGO "Pivdenno-zahidna zaliznitsya" and Central Power System NPC "Ukrenergo".

"CRAZY BBQ" Restaurant (Prolisky Village, Kyiv Region)

20.08.2015

Essence of the Project: construction of "CRAZY BBQ" Restaurant. Capacity of the "CRAZY BBQ" Restaurant makes 200 kW. Works executed by IKNET: TR was obtained at PJSC "Kyiveoblnergo"; development and approval of the Detailed Design of external supply in PJSC "Kyiveoblnergo".

IT-park with capacity 7,5 MW (Lviv city)

IT-park with capacity 7,5 MW (Lviv city)

20.08.2015

Essence of the Project: construction of building complex with research-and-production and industrial purpose objects, social infrastructure objects and parkings. Works executed by IKNET: audit of possible object connection to the power grids variants.