Wind power plant up to 1000 MW near the 750 kV substation "Kyivska" (Kyiv region)
30.06.2022
-
30.06.2022
-
30.06.2022
The essence of the project: construction of wind turbines, which will be located in Belotserkovsky district of Kyiv region Selection of the optimal connection option and capacity of wind turbines. Completed works of IKNET: developed TER "Connection of a new wind farm in the Belotserki district of the Kyiv region"; The TER is under approval by NEC &
30.06.2022
The essence of the project:to develop a scheme for issuing the power of wind turbines up to 150 MW, construction which is planned on the territory of the Vinnytsia region. Completed works of IKNET: the development of a feasibility study of the wind power generation scheme is indicative power up to 150 MW located on the territory of Vinnytsia region; The feas
30.06.2022
The essence of the project:preliminary determination of the possibility of connecting two wind power plants to the electrical grid of Ukraine 50-150 MW. Completed works of IKNET:a technical audit of the regions provided by the Customer was carried out in order to determine the possibility of connecting wind turbines to 330 kV substations with a minimum amount of their reconstruction.
29.06.2022
The essence of the project: to develop a scheme for issuing the power of wind turbines up to 150 MW, the construction of which is planned on the territory of the Odesa region. Completed works of IKNET: development of a feasibility study of the power generation scheme of wind power plants with an estimated capacity of up to 150 MW located in the Odesa region; The feasibili
29.06.2022
The essence of the project: joining the wind power plant, the construction of which is planned on the territory of the Dobroslav settlement community of the Odesa region. Completed works of IKNET: developed TER "Scheme of output of 100 MW wind turbine capacity on the territory of the Dobroslav settlement community in the Odesa district of the Odesa region"; The
08.03.2021
Project description: performing calculations of repair and repair and emergency modes of operation of electrical networks 110/150 and higher, when implementing the connection of a wind power plant with a capacity of 150 MW, the construction of which is planned in the Berdyansk district of the Zaporizhya region. Scope of
08.03.2021
Project description: construction of a 15 MW wind power plant near Yaremche, Ivano-Frankivsk region. Scope of IKNET: development of a preliminary feasibility study: assessment of the possibility of power supply to the network; the presence of environmental restrictions; preliminary installation of wind turbines on site and assessment of production.
08.03.2021
Project description: construction of two wind power plants with a capacity of up to 150 MW each with connection to the electric networks of the UES of Ukraine. Scope of IKNET: conducting a technical audit to determine the possibility of connecting to the electricity grids of the UES of Ukraine; analysis of 220-330 kV main substations in 17 regions of Ukraine.
08.03.2021
Project description: realization of the project of wind power plant of 300 MW in the Mykolaiv area. Scope of IKNET: conducting a technical audit (due diligence) of the project: assessment of wind potential; consideration of proposals for turbines and construction works; analysis of design solutions; environmental aspects;