SPP

Provider of commercial accounting services (ASKOE) of energy facilities

Provider of commercial accounting services (ASKOE) of energy facilities

29.06.2022

The essence of the project: service of ASKOE and transfer of data to SE "Guaranteed Buyer". Completed works of IKNET: Obtaining a PPKO license (EIS code: 62X289598939177F) to perform the role of commercial accounting data operator (ODCO), commercial accounting equipment operator (OZKO) and meter reading operator (OMD). Transfer of data to the commercial accounti

Forecasting electricity generation

Forecasting electricity generation

29.06.2022

-

Two solar power plants 4900 kW each (Zaporizhia region)

Two solar power plants 4900 kW each (Zaporizhia region)

09.03.2021

Project description: construction of two solar power plants with a capacity of 4900 kW each, located in the Yakymivskyi district of Zaporizhia region.

Two solar power plants with a capacity of 18.9 MW (Transcarpathian region)

Two solar power plants with a capacity of 18.9 MW (Transcarpathian region)

03.02.2021

Project description: construction of solar power plants with a capacity of 9 and 9.8 MW, located in the Transcarpathian region. Scope of IKNET: verification of design decisions of the technological part of SPP and GRP 35 kV, which a

Six solar power plants with a total capacity of 60.5 MW

Six solar power plants with a total capacity of 60.5 MW

03.02.2021

Project description: Full pre-investment technical audit of operating solar power plants in Dnepropetrovsk, Kherson and Vinnytsia regions.   Scope of IKNET: technical audit (due diligence) of existing solar power plants

Four solar power plants with a total capacity of 55.5 MW (Zhytomyr and Dnipropetrovsk regions)

Four solar power plants with a total capacity of 55.5 MW (Zhytomyr and Dnipropetrovsk regions)

03.02.2021

Project description: implementation of projects of 14 MW and 20 MW in Dnipropetrovsk region and 9.5 MW and 12 MW in Zhytomyr region.   Scope of IKNET: technical audit of projects: consideration and analysis of documents required for the implementation of the connection of SPP to power grids, technical conditions for non-standard connection to power grids of photovoltaic solar power plants in terms of their su

Solar power plant 40 MW (Cherkasy region)

Solar power plant 40 MW (Cherkasy region)

03.02.2021

Project description: construction of a solar power plant with a capacity of 40 MW in Chyhyryn district of Cherkasy region.   Scope of IKNET: determination of the sufficiency of documents for the design of the SPP power generation scheme; analysis of the developed design solutions according to the SPP power supply scheme; providing recommendations and conclusions r

Solar power plant 32 MW (Kiev region)

Solar power plant 32 MW (Kiev region)

03.02.2021

Project description:  construction of a 32 MW solar power plant, which is planned to be located in Rokytniansky district of Kyiv region.   Scope of IKNET: development of the project of the technological part of SPP and GRP 35 kV;

Solar power plant 2 MW (Kiev region)

Solar power plant 2 MW (Kiev region)

03.02.2021

Project description:  construction of a solar power plant with a capacity of 2 MW, which is planned to be located in Borodyansky district of Kyiv region.     Scope of IKNET: development of the project of the techn

Solar power plant 4 MW (Kiev region)

Solar power plant 4 MW (Kiev region)

03.02.2021

Project description: construction of a 4 MW solar power plant, which is planned to be located in Boryspil district of Kyiv region. Scope of IKNET: development of the project of the technological part of the solar power plant;

Show more