28.11.2024
28.11.2024
10.06.2024
03.06.2024
How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 5: Our theses, the implementation of which will give a strong impetus to the development of HMG in Ukraine: 1. Improvement of the Land Code, namely: The construction of WTGs can be carried out on land plots of any land category and/or type of designated purpose. 2. Improvement of the Law “On Finance...”, namely: to provide financial institutions with the opportunity to provide project financing for WTG and
31.05.2024
How the state provides incentives or “stimuli” for the development of highly maneuverable generation (HMG). Part 4: As of now, we record what incentives for HHG have been recently provided by the state: 1. Setting a fixed gas price at UAH 16500 including VAT per 1000 cubic meters of gas https://zakon.rada.gov.ua/laws/s
02.05.2024
How the state provides incentives or "stimuli" for the development of highly manoeuvrable generation (HMG). Part 3: Where to find reserves in existing generation? Currently, biogas plants with a total capacity of hundreds of MW are operating in the energy market. The exact capacity of the State Enterprise "Guaranteed Buyer" is not yet publicised. These plants operate at a feed-in tariff and supply electricity to the grid on a regular schedule throughout the day. The plants have 5 years left to operate at the green tariff. A big advantage of biogas pow
30.04.2024
How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 2: The optimal market for HMP operation is the ancillary services market (ASM). That is, the market where shunting generation and SPG are needed to maintain/restore frequency. And frequency is a key factor in electricity quality. Until mid-2023, an essential condition for certification to operate in the DSO market was the capacity of the facility - from 20 MW. Almost a year since this condition was changed! Now any plant from 1 MW can operate in th
29.04.2024
How the state provides incentives or ‘stimuli’ for the development of highly manoeuvrable generation (HMG). Part 1: Gas turbine (GTU) and gas piston units (GPU) are the only fast technical tools for the implementation of shunting power generation. Therefore, the CMU Resolution No. 222 of 06.03.2022 was amended to impose special obligations on natural gas market participants, namely: 1. Until 31.08.2024, NJSC Naftogaz of Ukraine purchases natural gas at a price of UAH 7,240 per 1000 cubic metres for electricity producers. 2. Until 31.08.2024, NJ
29.02.2024
March 20-21, 2024 Pochayna Event Hall Ukraine, Kyiv, Stepana Bandera Avenue, 23 Smart Building 2024 International Forum Smart Building - international professional exhibition and conference May 14-16,
26.02.2024
Moving with the times, IKNET has updated and improved its blog. Updating useful information can be especially useful for those interested in in modern energy technologies. The compact size makes the diary easy to use and convenient, and a pocket in the middle and a for a pen adds to its practicality.
13.04.2023
It has been more than a year since the active phase of the war with Russia began, which was not limited to the territory of Ukraine but also extended to the struggle for control over the power grids. The date of February 24, 2022, was not only the day of Russia's attack on Ukraine, but also the beginning of the Ukrainian power system's operation in isolation from the power systems of Russia and Belarus. In March 2022, Ukraine's power system was synchronized with the European power grid ENTSO-E. President of Ukraine Volodymyr Zelenskyy noted that this step allowed
25.03.2023
September 21-22, 2023
28.02.2023
-
21.02.2022
April 5-7, 2022 Ukraine, Kyiv, International Exhibition Center, 15 Brovarsky avenue, Livoberezhna metro station XIV International specialized exhibition "KIEV TECHNICAL FAIR-2022"
04.02.2021
Laws of Ukraine zakon2.rada.gov.ua/ Ministry of Energy and Coal Industry of Ukraine mpe.kmu.gov.ua/ NPC Ukrenergo, SE https://ua.energy/en/ Market operator, SE https://www.oree.com.ua/?lang=english
04.05.2020
-
21.12.2019
20.11.2017
16.08.2017
At least a word on "green" tariff Ask a couple of questions to youself…. How much costs are needed to spend on the production and sale of a liter of milk, or a kilogram of wheat, etc.? And what if we calculate all the steps of the technological process? If we, at the each step of production deduct a consumption costs for electricity? According to inaccurate calculations, with the full understanding of what we consider to be very superficial, the fact is that these amount of this costs is significant. We do not take much in
08.08.2017
The Ukrainian energy market is changing rapidly. On the number of investors who visit our country we have no one to compare with. Investors attentively listen our experts, which explain how to implement energy projects in our country. In fact, we share experiences. When they ask questions about the algorithm of implementing the investment project, our experts give advises to possible partners. The largest information block is the regulatory issues. This mean that we explain how, from the point of view of procedural part, it is faster to start to get a positive result at the end
01.08.2017