8,1 MW SPP of the Cherkasy region
31.08.2018
31.08.2018
28.08.2018
The land plots with an area of 23.1837 hectares and 13.2446 hectares is located outside the settlement on the territory of the Sokirintsi village council, Chortkiv district, Ternopil region, with the possibility of SPP construction with total capacity of approximately 16.87 MW. According to the Technical specifications on the SPP connection to the power grids of OJSC "Ternopiloblenergo" an indicative scheme of power delivery provides: construction of a new substation of 35 kV; construction of 35 kV transmission line; eplacing two 3
04.07.2018
Land plot of 20,24 hectares is located in Shpolyansky district Cherkasy region with the possibility of SPP construction, capacity of 9,8 MW. Geographical location of the land plot for SPP construction in Cherkassy region
04.07.2018
Land lot area occupies 15,2035 ha. It is located within administrative limits of Shubkiv village council near Kotiv village in Rivne region, and it can be used for the construction of SPP with approximate capacity of 8 MW. The scheme of a land lot accommodation in Rivne region
04.07.2018
Land lot area occupies 39,6138 ha. It is located in Ustynivka district Kirovohrad region, and it can be used for the construction of SPP with approximate capacity of 20 MW. The scheme of a land lot accommodation in Ustynivka district Kirovohrad region
04.07.2018
Land plots area occupies 22.4381 ha in total, located at the territory of Primorsk city Primorsk district Zaporizka region and can be used for the construction of SPP with approximate capacity of 9.9 MW. Scheme of a land plot accommodation at the territory of Primorsk city Primorsk district Zaporizka region ...
04.07.2018
Land plot area occupies 20.4 ha and is situated in eco site "Sad" at the territory of Zalukva village Halitsky district Ivano-Frankivsk region and can be used for construction of on-site SPP with capacity 9.8 МW. Land plot is located at a distance of 1.2 km from high voltage substation SS 110/35/10 kV "Halych". At the substation installed transformers with capacity 10 МVА and 16 MVA. According to the Technical requirements for connection of SPP to electricity grids of SC "Prykarpatjaoblenergo" the approximate power input sche...