29.06.2022
The essence of the project: service of ASKOE and transfer of data to SE "Guaranteed Buyer". Completed works of IKNET: Obtaining a PPKO license (EIS code: 62X289598939177F) to perform the role of commercial accounting data operator (ODCO), commercial accounting equipment operator (OZKO) and meter reading operator (OMD). Transfer of data to the commercial accounti
29.06.2022
-
09.03.2021
Project description: construction of two solar power plants with a capacity of 4900 kW each, located in the Yakymivskyi district of Zaporizhia region.
03.02.2021
Project description: construction of solar power plants with a capacity of 9 and 9.8 MW, located in the Transcarpathian region. Scope of IKNET: verification of design decisions of the technological part of SPP and GRP 35 kV, which a
03.02.2021
Project description: Full pre-investment technical audit of operating solar power plants in Dnepropetrovsk, Kherson and Vinnytsia regions. Scope of IKNET: technical audit (due diligence) of existing solar power plants
03.02.2021
Project description: implementation of projects of 14 MW and 20 MW in Dnipropetrovsk region and 9.5 MW and 12 MW in Zhytomyr region. Scope of IKNET: technical audit of projects: consideration and analysis of documents required for the implementation of the connection of SPP to power grids, technical conditions for non-standard connection to power grids of photovoltaic solar power plants in terms of their su
03.02.2021
Project description: construction of a solar power plant with a capacity of 40 MW in Chyhyryn district of Cherkasy region. Scope of IKNET: determination of the sufficiency of documents for the design of the SPP power generation scheme; analysis of the developed design solutions according to the SPP power supply scheme; providing recommendations and conclusions r
03.02.2021
Project description: construction of a 32 MW solar power plant, which is planned to be located in Rokytniansky district of Kyiv region. Scope of IKNET: development of the project of the technological part of SPP and GRP 35 kV;
03.02.2021
Project description: construction of a solar power plant with a capacity of 2 MW, which is planned to be located in Borodyansky district of Kyiv region. Scope of IKNET: development of the project of the techn
03.02.2021
Project description: construction of a 4 MW solar power plant, which is planned to be located in Boryspil district of Kyiv region. Scope of IKNET: development of the project of the technological part of the solar power plant;
03.02.2021
Project description: construction of a 4.95 MW solar power plant, which is planned to be located in the Pavlogradsky district of the Dnipropetrovsk region. Scope of IKNET: development of a working project of telemechanics and communication.
03.02.2021
Project description: assessment of the obtained technical conditions, search for optimized options for connecting a 170 MW SPP. Scope of IKNET: assessment of the existing electrical network and the search for alternative options for the
03.02.2021
Project description: construction of five solar power plants with a capacity of 925 kW each in the Mykolaivka village of the Novograd-Volynsky region of the Zhytomyr region.
03.02.2021
Project description: Legal support in the implementation of the project for the construction of a ground-based photovoltaic solar power plant located in the town of Grebinka, Poltava region. Scope of IKNET: consulting support for the imple
03.02.2021
Project description: Technical audit of the design documentation of a solar power plant with an installed capacity of 0.78 MW, the construction of which is planned in Andriyivka village, Balakliisky district, Kharkiv region.
30.12.2019
Essence of the Project: construction of a solar power plant with a capacity of 2.475 MW in Zhytomyr region.
17.12.2019
Essence of the Project: the construction of a 9.9 MW solar power plant on the territory of the Dymerka village council of the Vyshgorod district of the Kyiv region. Works executed by IKNET: organization of receiving TS on connection of PVP with capacity of 9.9 MW in PJSC "Kyivoblenergo"; development and appr
17.12.2019
Essence of the Project: the construction of a 15 MW solar power plant in the Lobachivsk village council of the Volodarsky district of the Kyiv region. Works executed by IKNET: organization of receiving TS for connection of PVP with capacity
17.12.2019
Essence of the Project: the construction of a 9.9 MW solar power station on the territory of the Nebratsk village council of Borodyanka district of the Kyiv region. Works executed by IKNET: organization of receipt of TS on connection of PVP with ca
17.12.2019
Essence of the Project: the construction of a 9.9 MW solar power plant on the territory of the Khalchansk village council in the Kagarlyk district of the Kyiv region. Works executed by IKNET: organization of receiving TS for connection of PVP with capacity of 9.9 MW in PJSC "Kyivoblenergo"; development
17.12.2019
Essence of the Project: Construction of a solar power plant with a capacity of 7.5 MW on the territory of the Babintsy settlement council of Borodyanka district, Kyiv region. Works executed by IKNET: organization of receipt of Technical Spec
16.12.2019
Essence of the Project: the construction of a 9.9 MW solar power plant on the territory of the Kozintsy Village Council of Borodiansky District, Kyiv region. Works executed by IKNET: organization of receiving TS for connection of PVP with capacity of 9.9 MW in PJSC "Kyivoblenergo";
16.12.2019
Essence of the Project: conducting a technical audit of documentation for the construction of a 9.3 MW solar power plant in the Petrovsky district of the Kirovograd region. Works executed by IKNET: audit of the existing documents, which are necessar
16.12.2019
Essence of the Project: conducting a technical audit of documentation for the construction of a solar power plant of 10.5 MW in the Snyatinsky district of Ivano-Frankivsk region. Works executed by IKNET: audit of existing documents necessary for det