29.06.2022
The essence of the project: service of ASKOE and transfer of data to SE "Guaranteed Buyer". Completed works of IKNET: Obtaining a PPKO license (EIS code: 62X289598939177F) to perform the role of commercial accounting data operator (ODCO), commercial accounting equipment operator (OZKO) and meter reading operator (OMD). Transfer of data to the commercial accounti
29.06.2022
-
09.03.2021
Project description: construction of two solar power plants with a capacity of 4900 kW each, located in the Yakymivskyi district of Zaporizhia region.
03.02.2021
Project description: construction of solar power plants with a capacity of 9 and 9.8 MW, located in the Transcarpathian region. Scope of IKNET: verification of design decisions of the technological part of SPP and GRP 35 kV, which a
03.02.2021
Project description: Full pre-investment technical audit of operating solar power plants in Dnepropetrovsk, Kherson and Vinnytsia regions. Scope of IKNET: technical audit (due diligence) of existing solar power plants
03.02.2021
Project description: implementation of projects of 14 MW and 20 MW in Dnipropetrovsk region and 9.5 MW and 12 MW in Zhytomyr region. Scope of IKNET: technical audit of projects: consideration and analysis of documents required for the implementation of the connection of SPP to power grids, technical conditions for non-standard connection to power grids of photovoltaic solar power plants in terms of their su
03.02.2021
Project description: construction of a solar power plant with a capacity of 40 MW in Chyhyryn district of Cherkasy region. Scope of IKNET: determination of the sufficiency of documents for the design of the SPP power generation scheme; analysis of the developed design solutions according to the SPP power supply scheme; providing recommendations and conclusions r
03.02.2021
Project description: construction of a 32 MW solar power plant, which is planned to be located in Rokytniansky district of Kyiv region. Scope of IKNET: development of the project of the technological part of SPP and GRP 35 kV;
03.02.2021
Project description: construction of a solar power plant with a capacity of 2 MW, which is planned to be located in Borodyansky district of Kyiv region. Scope of IKNET: development of the project of the techn
03.02.2021
Project description: construction of a 4 MW solar power plant, which is planned to be located in Boryspil district of Kyiv region. Scope of IKNET: development of the project of the technological part of the solar power plant;
03.02.2021
Project description: construction of a 4.95 MW solar power plant, which is planned to be located in the Pavlogradsky district of the Dnipropetrovsk region. Scope of IKNET: development of a working project of telemechanics and communication.
03.02.2021
Project description: assessment of the obtained technical conditions, search for optimized options for connecting a 170 MW SPP. Scope of IKNET: assessment of the existing electrical network and the search for alternative options for the
03.02.2021
Project description: construction of five solar power plants with a capacity of 925 kW each in the Mykolaivka village of the Novograd-Volynsky region of the Zhytomyr region.
03.02.2021
Project description: Legal support in the implementation of the project for the construction of a ground-based photovoltaic solar power plant located in the town of Grebinka, Poltava region. Scope of IKNET: consulting support for the imple
03.02.2021
Project description: Technical audit of the design documentation of a solar power plant with an installed capacity of 0.78 MW, the construction of which is planned in Andriyivka village, Balakliisky district, Kharkiv region.
30.12.2019
Essence of the Project: construction of a solar power plant with a capacity of 2.475 MW in Zhytomyr region.
17.12.2019
Essence of the Project: the construction of a 9.9 MW solar power plant on the territory of the Dymerka village council of the Vyshgorod district of the Kyiv region. Works executed by IKNET: organization of receiving TS on connection of PVP with capacity of 9.9 MW in PJSC "Kyivoblenergo"; development and appr
17.12.2019
Essence of the Project: the construction of a 15 MW solar power plant in the Lobachivsk village council of the Volodarsky district of the Kyiv region. Works executed by IKNET: organization of receiving TS for connection of PVP with capacity
17.12.2019
Essence of the Project: the construction of a 9.9 MW solar power station on the territory of the Nebratsk village council of Borodyanka district of the Kyiv region. Works executed by IKNET: organization of receipt of TS on connection of PVP with ca
17.12.2019
Essence of the Project: the construction of a 9.9 MW solar power plant on the territory of the Khalchansk village council in the Kagarlyk district of the Kyiv region. Works executed by IKNET: organization of receiving TS for connection of PVP with capacity of 9.9 MW in PJSC "Kyivoblenergo"; development
17.12.2019
Essence of the Project: Construction of a solar power plant with a capacity of 7.5 MW on the territory of the Babintsy settlement council of Borodyanka district, Kyiv region. Works executed by IKNET: organization of receipt of Technical Spec
16.12.2019
Essence of the Project: the construction of a 9.9 MW solar power plant on the territory of the Kozintsy Village Council of Borodiansky District, Kyiv region. Works executed by IKNET: organization of receiving TS for connection of PVP with capacity of 9.9 MW in PJSC "Kyivoblenergo";
16.12.2019
Essence of the Project: conducting a technical audit of documentation for the construction of a 9.3 MW solar power plant in the Petrovsky district of the Kirovograd region. Works executed by IKNET: audit of the existing documents, which are necessar
16.12.2019
Essence of the Project: conducting a technical audit of documentation for the construction of a solar power plant of 10.5 MW in the Snyatinsky district of Ivano-Frankivsk region. Works executed by IKNET: audit of existing documents necessary for det
16.12.2019
Essence of the Project: construction of a power station with a capacity of 9,995 kW in the territory of the city of Marhanets, Dnipropetrovsk region. Works executed by IKNET: technical and economic calculation (TEC) “Calculations of the impact of a 9.995 MW solar power plant on the o
15.08.2019
Essence of the Project: the construction of a 30 kW solar power plant on a land plot of a private person located at the address: Cherkasy region, Smiliansky district, Mykolaivka village. Works executed by IKNET: development of a project for the SPP cons
15.08.2019
Essence of the Project: construction of a 19 900 kW solar power plant in Shyroke village, Zaporizhzhya region. Works executed by IKNET: The technical and economical calculation "Calculation of the impact of the connection to the electric power gridss of the new solar power station with the insta
15.08.2019
Essence of the Project: Construction of a 9 MW solar power plant in the Starosynyavsky district of the Khmelnytsky region. Works executed by IKNET: technical audit of
15.08.2019
Essence of the Project: Construction of a 30 MW solar power plant near the Orbita settlement of the Chyhyryn district of the Cherkasy region. Works executed by IKNET: The feasibility study "The scheme of power output of a solar power plant with a capacity of 30 MW located near the Orbita settlement of the Chyhyryn district