Biogas/Biomass

Turbogenerator with condenser turbine 23,751 MW (Kirovograd region)

Turbogenerator with condenser turbine 23,751 MW (Kirovograd region)

03.02.2021

Project description: connection to external power grids of a turbine generator with a condensing turbine with a capacity of 23.751 MW. Scope of IKNET: development and approval of a working design for the new construction of 35 kV cable

1.5 MW cogeneration unit at a biogas station in Donetsk region

1.5 MW cogeneration unit at a biogas station in Donetsk region

14.08.2019

Essence of the Project: implementation of the Automated Electricity Commercial Accounting System (AECAS) for a 1.5 MW cogeneration plant in a biogas plant in Volnovakha, Donetsk region.

Biomass power plant 9 МW (Кyiv region)

Biomass power plant 9 МW (Кyiv region)

21.12.2017

Essence of the Project: construction of biomass power plant with installed capacity 9 MW in Kyiv region. Works executed by IK NET: determination of the optimal possibility of parallel operation of the biomass power plant with United Energy System of Ukraine, including the required amount of electricity grid construction and estimated costs.

CHP on peanut sunflower with capacity 7 МW (Odessa region)

CHP on peanut sunflower with capacity 7 МW (Odessa region)

21.12.2017

Essence of the Project: construction of CHP on peanut sunflower with capacity 7 МW in Odessa region. Works executed by IK NET: choosing of the optimal possibility of parallel operation of the CHP on peanut sunflower with United Power System of Ukraine, including the required amount of electricity grid construction and estimated costs.

Biogas power plant 1,3 МW (Cherkasy city)

Biogas power plant 1,3 МW (Cherkasy city)

21.12.2017

Essence of the Project: construction of the biogas power plant with capacity 1.3 MW in Cherkasy city. Works executed by IKNET: determination of the optimal possibility of parallel operation of the biogas power plant with United Power System of Ukraine, including the required amount of electricity grid construction and estimated costs.    

Engineering complex with installed system of biogas collection from SDW landfill for production of electricity (Stadnitsya Village, Vinnitsky Region)

Engineering complex with installed system of biogas collection from SDW landfill for production of electricity (Stadnitsya Village, Vinnitsky Region)

20.08.2015

Essence of the Project: construction of engineering complex with installed system of biogas collection. Electric capacity of the generating unit is 1 MW. Works executed by EC NET: project supervision concerning construction of the facility; its commissioning and putting into operation; preparation and processing of all necessary documents in order to obtain license at the NKREKP; consulting support of obtaining of Membership in SE "Energorynok"; preparation and regist

Engineering complex with installed system of biogas in Ukraine collection from SDW landfill for production of electricity (Obukhiv district, Kyiv region)

Engineering complex with installed system of biogas in Ukraine collection from SDW landfill for production of electricity (Obukhiv district, Kyiv region)

27.07.2015

Construction of complex engineering facility with the system of biogas collection at the solid domestic wastes (SDW) landfill No. 5 in Obukhiv district of Kyiv region. Electric capacity of the generating unit is 885 kW. In this project our company executed the following activities: Project supervision concerning construction of the facility; its commissioning and putting into operation; Estimation of the tariff on production of electricity by generating unit; Preparation and processing of all necessary documen

Integrated engineering structure with the system for collecting biogas from the landfill for production of electricity with a capacity of 680 kW (Kremenchug, Poltava region).

Integrated engineering structure with the system for collecting biogas from the landfill for production of electricity with a capacity of 680 kW (Kremenchug, Poltava region).

27.07.2015

Construction of a generating plant with a capacity of 680 kW for electricity production from biogas at an existing solid domestic waste landfill in Kremenchuk. Works executed by IKNET: an audit of the project was conducted to further connecting of the generating unit to the power grid and putting the facility into operation, taking into account the further sale of generated electricity to the WEM at the "green" tariff;  identified inconsistencies in the submitted documents and provided recommendations for making the nece

Engineering complex with installed system of biogas collection from SDW landfill for electricity production with capacity of 1063 kW (Borispil district, Kyiv region)

Engineering complex with installed system of biogas collection from SDW landfill for electricity production with capacity of 1063 kW (Borispil district, Kyiv region)

27.07.2015

Essence of the Project: construction of the engineering complex with installed system of biogas collection from SDW landfill for electricity production. The facility is located at the territory of Glyboke village council of Borispil district, Kyiv region. Power generating capacity of the facility is 1063 kW. Works executed by EC NET: Estimation of the tariff for power energy production; Preparation and processing of all necessary documents in order to approve "green" tariff at the NERC. NERC

System of biogas collection and utilization at the SDW landfill (Mariupol, Donetsk region)

System of biogas collection and utilization at the SDW landfill (Mariupol, Donetsk region)

27.07.2015

At the solid domestic wastes (SDW) landfill in Mariupol, Donetsk region was executed construction of the degassing system for biogas collection and utilization by the installed co-generating unit with capacity of 200 kW. Our company has executed the following complex of measures: audit of this project with purpose to organize work of facility at the Wholesale Electricity Market (WEM) by "green" tariff. In the frame of the audit was defined complex of measures necessary for further realization of the project, and

The biogas collection and utilization system for electricity production at the Chernigov Solid Household Waste Landfill

The biogas collection and utilization system for electricity production at the Chernigov Solid Household Waste Landfill

27.07.2015

Construction of a generating plant with a capacity of 800 kW for electricity production from biogas at an existing solid domestic waste landfill in Chernigov. Works executed by IKNET: an audit of the project was conducted to further connecting of the generating unit to the power grid and putting the facility into operation, taking into account the further sale of generated electricity to the WEM at the "green" tariff;  identified inconsistencies in the submitted documents and provided recommendations for making the neces

Show more