Essence of the Project: construction of the biogas power plant with capacity 1.3 MW in Cherkasy city.
Works executed by IKNET:
determination of the optimal possibility of parallel operation of the biogas power plant with United Power System of Ukraine, including the required amount of electricity grid construction and estimated costs.