Essence of the Project: conducting a technical audit of documentation for the construction of a solar power plant of 10.5 MW in the Snyatinsky district of Ivano-Frankivsk region.
Works executed by IKNET:
- audit of existing documents necessary for determining the cost of producing electric power of a solar power plant of 10.5 MW;
- assessment of the risks of limiting the SPP power output (technical and legal), taking into account perspective objects of the renewable energy sources of the district;
- assessment of the connection cost;
- impact of the approved scheme of connection on the cost of connection, and the risks of cost increase are investigated.