• Wind power plant of 150 MW (Zaporizhia region)

    Wind power plant of 150 MW (Zaporizhia region)

    9.03.2021

    Project description: performing calculations of repair and repair and emergency modes of operation of electrical networks 110/150 and higher, when implementing the connection of a wind power plant with a capacity of 150 MW, the construction of which is planned in the Berdyansk district of the Zaporizhya region. Scope of IKNET: assessment of the existing network and search for alternative options for power delivery; search for a regulatory scheme for connecting WPP (technical ...

  • Wind power plant 15 MW  (Ivano-Frankivsk region)

    Wind power plant 15 MW (Ivano-Frankivsk region)

    9.03.2021

    Project description: construction of a 15 MW wind power plant near Yaremche, Ivano-Frankivsk region. Scope of IKNET: development of a preliminary feasibility study: assessment of the possibility of power supply to the network; the presence of environmental restrictions; preliminary installation of wind turbines on site and assessment of production.

  • Two wind power plants of 150 MW each

    Two wind power plants of 150 MW each

    9.03.2021

    Project description: construction of two wind power plants with a capacity of up to 150 MW each with connection to the electric networks of the UES of Ukraine. Scope of IKNET: conducting a technical audit to determine the possibility of connecting to the electricity grids of the UES of Ukraine; analysis of 220-330 kV main substations in 17 regions of Ukraine.

  • Wind power plant of 300 MW (Nikolaev region)

    Wind power plant of 300 MW (Nikolaev region)

    9.03.2021

    Project description: realization of the project of wind power plant of 300 MW in the Mykolaiv area. Scope of IKNET: conducting a technical audit (due diligence) of the project: assessment of wind potential; consideration of proposals for turbines and construction works; analysis of design solutions; environmental aspects; analysis of the connection to the electrical network; permissive issues.

  • Wind power plant of 100 MW (Odessa region)

    Wind power plant of 100 MW (Odessa region)

    9.03.2021

    Project description: implementation of a 100 MW WPP project in the Odessa region.   Scope of IKNET: Customer's technical consultant: analysis of design decisions on compliance with regulatory requirements and optimization of investments by: - cable lines for collecting power of the 35 kV facility; - 110/35 kV substation and 110 kV transmission line to the connection point; - ASCME (automated system of control and metering of energy resources) project; - SCADA WP...

  • Wind power plant 21 MW (Cherkasy region)

    Wind power plant 21 MW (Cherkasy region)

    9.03.2021

    Project description:  construction of a wind power plant with a capacity of 21 MW, which is planned to be located in Chyhyryn district of Cherkasy region.     Scope of IKNET: analysis of electrical networks in order to determine the most optimal connection scheme and installed capacity of wind power plant in Cherkasy region.

  • 72 MW wind power plant (Rivne region)

    72 MW wind power plant (Rivne region)

    9.03.2021

    Project description: construction of a 72 MW wind power plant near the Dovgovolya village, Volodymyretsky district, Rivne region. Scope of IKNET: a feasibility study was developed for the power delivery scheme of a wind power plant with a projected capacity of 72 MW in order to analyze the possibility of power delivery from a wind power plant and the development of power delivery schemes that comply with the current standards.

  • Three wind power plants with a total capacity of up to 180 MW (Zhytomyr region)

    Three wind power plants with a total capacity of up to 180 MW (Zhytomyr region)

    9.03.2021

    Project description: construction of three wind power plants with a total capacity of up to 180 MW in the Zhytomyr region. Scope of IKNET:   the feasibility study of the scheme of power supply of three wind power plants with a total capacity of up to 180 MW in the Zhytomyr region was developed; feasibility study agreed in JSC "Zhytomyroblenergo".

  • Three wind power plants with a capacity of up to 120 MW (Zhytomyr region)

    Three wind power plants with a capacity of up to 120 MW (Zhytomyr region)

    9.03.2021

    Project description:  construction of three wind power plants with a total capacity of up to 120 MW in the Zhytomyr region. Scope of IKNET: the feasibility study of the scheme of power supply of three wind farms with a total capacity of up to 120 MW in the Zhytomyr region was developed; feasibility study agreed in JSC "Zhytomyroblenergo".

  • 25 MW wind power plant (Mykolaiv region)

    25 MW wind power plant (Mykolaiv region)

    18.12.2019

    Essence of the Project: Construction of a 25 MW wind power plant within Parutynska and Ostrivska village councils of Ochakivsky district, Mykolaiv regiont. Works executed by IKNET: The feasibility study "The scheme of power output of a 25 MW wind power plant within the Parutynska and Ostrovskay village councils of Ochakivsky district of Mykolaiv region was developed; The feasibility study has been approved by SE "NPC "Ukrenergo".