Company's Projects

Wind power plant up to 1000 MW near the 750 kV substation

Wind power plant up to 1000 MW near the 750 kV substation "Kyivska" (Kyiv region)

30.06.2022

-

Wind power plant 100 MW (Kyiv region)

Wind power plant 100 MW (Kyiv region)

30.06.2022

The essence of the project: construction of wind turbines, which will be located in Belotserkovsky district of Kyiv region Selection of the optimal connection option and capacity of wind turbines.   Completed works of IKNET: developed TER "Connection of a new wind farm in the Belotserki district of the Kyiv region"; The TER is under approval by NEC &

Wind power plant up to 150 MW (Vinnytsia region)

Wind power plant up to 150 MW (Vinnytsia region)

30.06.2022

The essence of the project:to develop a scheme for issuing the power of wind turbines up to 150 MW, construction which is planned on the territory of the Vinnytsia region.   Completed works of IKNET: the development of a feasibility study of the wind power generation scheme is indicative power up to 150 MW located on the territory of Vinnytsia region; The feas

Two wind power plants with a capacity of 50-150 MW

Two wind power plants with a capacity of 50-150 MW

30.06.2022

The essence of the project:preliminary determination of the possibility of connecting two wind power plants to the electrical grid of Ukraine 50-150 MW. Completed works of IKNET:a technical audit of the regions provided by the Customer was carried out in order to determine the possibility of connecting wind turbines to 330 kV substations with a minimum amount of their reconstruction.

Wind power plant 150 MW (Odesa region)

Wind power plant 150 MW (Odesa region)

29.06.2022

The essence of the project: to develop a scheme for issuing the power of wind turbines up to 150 MW, the construction of which is planned on the territory of the Odesa region. Completed works of IKNET: development of a feasibility study of the power generation scheme of wind power plants with an estimated capacity of up to 150 MW located in the Odesa region; The feasibili

Wind power plant 100 MW (Odesa region)

Wind power plant 100 MW (Odesa region)

29.06.2022

The essence of the project: joining the wind power plant, the construction of which is planned on the territory of the Dobroslav settlement community of the Odesa region. Completed works of IKNET: developed TER "Scheme of output of 100 MW wind turbine capacity on the territory of the Dobroslav settlement community in the Odesa district of the Odesa region"; The

Provider of commercial accounting services (ASKOE) of energy facilities

Provider of commercial accounting services (ASKOE) of energy facilities

29.06.2022

The essence of the project: service of ASKOE and transfer of data to SE "Guaranteed Buyer". Completed works of IKNET: Obtaining a PPKO license (EIS code: 62X289598939177F) to perform the role of commercial accounting data operator (ODCO), commercial accounting equipment operator (OZKO) and meter reading operator (OMD). Transfer of data to the commercial accounti

Forecasting electricity generation

Forecasting electricity generation

29.06.2022

-

50 MW / 100 MW × energy storage system

50 MW / 100 MW × energy storage system

29.06.2022

-

Scheme of perspective development of the distribution system until 2029

Scheme of perspective development of the distribution system until 2029

29.06.2022

-

Show more